Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published April 25, 2023 at 8:00 PM
Updated January 26, 2024
Site work and paving for a sidewalk / parking lot in Bloomington, Indiana. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Project Location: Approximately 400' south of the Griffy Creek stream crossing at Bloomington Griffy Lake Dam Trail Crossing Constructions This project titled 'Griffy Lake Dam Trail Crossing' shall include, but is not limited to improvements including site preparation, excavation, earthwork, fill, approximately 850 feet of trail construction, demolition, construction of fencing, and the construction of an approximately 200-foot long staircase at the site of the Griffy Lake Dam on N Dunn St. in Bloomington, IN. A trail will be constructed along the crest of Griffy Lake Dam (State ID 53-3)with connectivity to the parking lot at the downstream toe of the dam. The segment of trail along the dam crest will complete a loop around the lake with connectivity to existing trails along the north and south shores of the lake. The scope of work includes constructing an 860' long. 12" wide gravel (base bid) or concrete (alternate bid) trail along the dam crest with the area of trail construction excavated and backfilled to maintain the existing dam crest elevation of 642.5'. NAVD 1088. The project also includes installing cedar spilt rail and chain link fence along the crest to keep trail users off the dam and installing signage to direct trail users to stay off the dam. At the west end of the dam a 170" long. 6' wide, elevated wooden staircase will be constructed on the downstream slope of the dam to carry the trail from the dam crest to the base of the dam and an existing gravel parking lot. Riprap will be placed over a geotextile fabric beneath and adjacent to the stairs.
Award
Sidewalks / Parking Lot
$334,800.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 7, 2023
April 6, 2023
N Dunn St, Bloomington, IN
Related To This Project
Bloomington, IN
--
Bloomington, IN
Bid Date: Mar 16 2023
Bloomington, IN
Bid Date: Mar 03 2023
Bloomington, IN
--
Bloomington, IN
--
Bloomington, IN
--
Bloomington, IN
Bid Date: Mar 27 2023
Bloomington, IN
Bid Date: Mar 28 2023
Bloomington, IN
Bid Date: Mar 16 2023
Bloomington, IN
Bid Date: Mar 09 2023
Bloomington, IN
Bid Date: Mar 09 2023
Bloomington, IN
Bid Date: Feb 21 2023
Bloomington, IN
Bid Date: Feb 28 2023
Bloomington, IN
Bid Date: Mar 30 2023
Bloomington, IN
Bid Date: Feb 23 2023
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed