Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, outdoor lighting and new construction of a mixed-use development in Waukee, Iowa. Completed plans call for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; and water / sewer project.
For the following described public improvement: STRATFORD CROSSING PARK. In-person meetings are subject to change under certain circumstances, including but not limited to higher than average participation or changes in health guidelines. If the meeting shall be held electronically only, notice shall be posted to the City website (Waukee.org) and City social media. Questions regarding meeting format may also be directed to the City Clerk's office at 515-978-7904. All persons wishing to observe or participate in this meeting may do so via Zoom or telephone. Please contact the City Clerk's office at 978-7904 or bschuett@waukee.org if you have questions or electronic accessibility issues. During said hearing, any interested person may participate and/or file objections thereto or to the cost of the improvements. The extent of the work on this project is the furnishing of all labor, equipment, and materials for the construction of improvements in Waukee generally described as follows: The Stratford Crossing Park improvements include: Construction of a premanufactured kit-built restroom building, including but not limited to: full restroom, mechanical room, electrical, water, and sanitary connections, final electrical and plumbing trim out, and all associated finish work (sealing, caulking, signage, etc). Site work includes: PCC sidewalk/trail w/ detectable warning plates where shown, PCC drive and parking with integral curbs, pavement striping, PCC subbase and integral curbs, PCC beam curbs, PCC basketball court w/ striping, PCC footings, foundations and stoops as indicated on plans, along with associated earthwork and aggregate subbase work; parking signs and posts; installation of open-air shelters, and column wraps on all shade structure and restroom building posts; complete basketball hoop system; timber bench; landscaping includes evergreen trees, deciduous overstory and understory trees, shrubs, sod, seeded lawn, and native seed areas and planting soils; bioretention basin with engineered soil and aggregates; sediment and erosion control measures shall be installed and maintained as shown on plans; site utilities include storm sewer, sanitary sewer, water, and electrical, including connection to existing transformer; electrical work also includes drive/parking lot light poles and luminaires, and restroom and shade structure lighting. Playground equipment, poured in place rubber and playground mulch surfacing procurement and install is by Owner's contractor - not in contract. Site furnishings, with the exception of the timber bench, are by owner. The kinds of materials, estimated quantities, and work to be done for the project on which bids will be received are as shown on the bid proposal for said project. All work is to be done in strict compliance with the Plans and Specifications prepared by the Engineer which have been heretofore approved by the City Council and which are now on file for public examination in the office of the City Clerk. All bids shall be made on a form furnished by the City and shall be filed before the time specified above, in a sealed envelope addressed to the City Clerk of Waukee, Iowa, clearly stating that the envelope contains a bid on this project. Each bidder shall accompany its bids with bid security as defined in Iowa Code Section 26.8, as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in a form acceptable to the City for the faithful performance of the contract and guaranteeing payment to all persons supplying labor and/or materials in the execution of the work provided for in the contract, in an amount equal to 100% of the amount of the contract. Additionally the bidder must provide the City with a guarantee of maintenance of said improvement for a period of two (2) years from the time of acceptance by the City. The bidder's security shall be in an amount equal to ten percent (10%) of the total amount of the bid and shall be in the form of a cashier's check or a certified check drawn on an FDIC insured bank in Iowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a bid bond on the form provided in the contract documents with corporate surety satisfactory to the City. The bid shall contain no condition except as provided in the specifications. If the bidder fails to execute the contract and to furnish an acceptable performance, payment, and maintenance bond or provide a Certificate of Insurance within ten (10) days after acceptance of the bid by the City, the bid security may be forfeited or cashed by the City as liquidated damages. By virtue of statutory authority, a preference will be given to products and provisions grown and produced within the State of Iowa. In accordance with Iowa statutes, a resident bidder shall be allowed a preference as against a nonresident bidder from a state or foreign country if that state or foreign country gives or requires any preference to bidders from that state or foreign country, including but not limited to any preference to bidders, the imposition of any type of labor force preference, or any other form of preferential treatment to bidders or laborers from that state or foreign country. The preference allowed shall be equal to the preference given or required by the state or foreign country in which the nonresident bidder is a resident. In the instance of a resident labor force preference, a nonresident bidder shall apply the same resident labor force preference to a public improvement in this state as would be required in the construction of a public improvement by the state or foreign country in which the nonresident bidder is a resident. Failure to submit a fully completed Bidder Status Form with the bid may result in the bid being deemed nonresponsive and rejected. A sales tax exemption certificate will be available for all material purchased for incorporation in the project. Work on said project shall commence within ten (10) days of a written notice to proceed and shall be completed by: September 15, 2023. The duration of the work is critical to the project so as to minimize damage to other streets and public infrastructure and the disruption associated with the project to the public. Damages in the amount of seven hundred and fifty ($750.00) per calendar day will be assessed for each day the work shall remain uncompleted after the end of the contract period at the sole discretion of the City which at the option of the City may be deducted from any retainage prior to release, the final payment to contractor, or through the commencement of a cause of action by the City, in the City's sole discretion. The selection by the City of any particular course of action hereunder is not exclusive and shall not preclude the pursuit of additional remedies by the City. In the event the City institutes legal proceedings, the Contractor shall be responsible for any and all attorney's fees and expenses. Payment for the work will be made by the City in cash from such funds as may be legally available including cash on hand, proceeds from the sale and issuance of General Obligation Bonds and such other funds including the proceeds from the sale and issuance of such other bonds as may lawfully be issued as the City Council may at its sole discretion determine and provide. Payment to the Contractor will be on the basis of monthly estimates equivalent to ninety-five percent (95%) of the contract value of the work completed and payments made to material suppliers for materials ordered specifically for the project or delivered to the site during the preceding calendar month. Estimates will be prepared on the first day of each month by the Contractor, subject to the approval of the Engineer. Such monthly payments shall in no way be construed as an act of acceptance for any part of the work partially or totally completed. Final payment by the City will be made in accordance with Iowa statutes and the contract documents. The City reserves the right to reject any and/or all bids and to waive any and/or all technicalities and/or all irregularities.
Award
Playgrounds / Parks / Athletic Fields
$1,446,514.00
Public - City
New Construction, Outdoor Lighting, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 2, 2023
April 19, 2023
1250 NW Yorktown Dr, Waukee, IA
Related To This Project
Waukee, IA
Bid Date: Mar 07 2023
Waukee, IA
--
Waukee, IA
--
Waukee, IA
--
Waukee, IA
--
Waukee, IA
Bid Date: Mar 02 2023
Waukee, IA
Bid Date: Apr 04 2023
Waukee, IA
Bid Date: Feb 09 2023
Waukee, IA
Bid Date: Feb 08 2023
Waukee, IA
--
Waukee, IA
--
Waukee, IA
--
Waukee, IA
--
Waukee, IA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.