Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 7, 2023

May 8, 2023

Post-Bid

Educational

Public - City

Service, Maintenance and Supply

img_map_placeholder

Multiple Locations, Wyalusing, PA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

This is a service / maintenance or supply contract in Wyalusing, Pennsylvania. Contact the soliciting agency for additional information.

The Wyalusing Area School District is soliciting sealed bids for Lawn Mowing. If you have any questions or concerns regarding this bid, please contact Laura Carr at (570)746- 1600 or lcarr@wyalusingrams.com Locations: Max Gannon Campus Wyalusing Valley JR-SR High School, 11364 Wyalusing New Albany RD, Wyalusing PA 18853 Wyalusing Valley Elementary School, 11450 Wyalusing New Albany RD, Wyalusing PA 18853 1. Cutting and Trimming Schedule - Grass shall be cut and trimmed according to the growth: during drought conditions, grass will be allowed to grow higher than during rainy season. Keeping in mind that some areas grow faster than other areas. Weeds like dandelions will demand attention in the spring to keep appearance of the grounds well groomed. 2. Hours of Cutting - Grass cutting, and other operations using powered machinery, may take place only when children are not engaged in outdoor activities on the school grounds. 3. Cutting and trimming Standards - Grass Height: Grass shall be cut to a height of 1 1/2 to 2 inches, or as adjusted by the Director of Facilities. If the contractor falls behind schedule and missed a cutting, grass clippings may need picking up preventing clumping. Weather Conditions: The Director of Facilities in coordination with the contractor will review conditions affecting the normal mowing schedule. These conditions may include drought or heavy rain which may result in postponing a schedule cutting. All cutting, including slopes and irregular areas, at a particular area shall be accomplished in a single day. Trimming: The contractor shall trim as a part of each cutting. Trimming must be accomplished either same day as the cutting or the following day. Trimming shall be accomplished around all buildings, trees, shrubs, fixed objects, and along all curbs and sidewalks. Trimming height shall be the same as the grass cutting height. Trimming must be accomplished in conjunction with the cutting The Contract will, in general, be awarded to the lowest qualified bidder. The District however, reserves the right to reject any and all bids, whether from responsible bidders or otherwise, and to waive any informalities or technicalities deemed to be in the best interest of the District.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Starting At

  • One License and data in one market (additional available after purchase)
  • Full access to bidding and planning projects’ details, documents and contacts
  • Comprehensive planholders list coverage on bidding projects
  • Additional licenses and project data across multiple markets available

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Don't miss Bidding Projects!

Within 75 Miles of this Project:
166
Active Projects
86
Bidding Soon

Related Projects