Renovation of a water / sewer project in Neptune Beach, Florida. Completed plans call for the renovation of a water / sewer project.

The City of Neptune Beach is soliciting Bids for the rehabilitation of Plant 2, located at 2010 Forest Avenue Neptune Beach. Florida 32266. Bids require a five percent (5%) Bid Security in the form of a certified check or bank money order or a Bid Bond and may not be withdrawn after the scheduled opening time for a period of sixty (60) days. The City of Neptune Beach reserves the right to change the time and date of the pre-Bid meeting, to change the Bid due date and time, to accept any bid, reject any or all bids, to waive informalities and make the award or any portion thereof that, in the Buyers sole and absolute judgment, will be in the best interest of the Buyer in any manner thereof. All questions about the meaning or intent of the Procurement Documents are to be submitted in writing to the Issuing Office at pwbids@nbfl.us. Any provisions for liquidated damages, such as those for Seller's failure to attain a specified Milestone such as the delivery of the Goods, substantial completion, and final completion are set forth in the Procurement Contract.

Post-Bid

Water / Sewer

$5,000,000.00

Public - City

Renovation

53

22

47

11

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Warranties, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection
Division 08 - Openings

Division 08 - Openings

Hardware, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Enclosed Bus Assemblies, Facility Electrical Power Generating and Storing Equipment
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Dewatering, Fill, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Lifting Devices, Clamps, Manufacturing Equipment, Dies and Molds, Molds
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment, Gas and Liquid Storage, Gas and Liquid Storage Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
51
Bidding Soon
735
All Active Projects
326
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2023

January 29, 2024

img_map_placeholder

2010 Forest Ave, Neptune Beach, FL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Wastewater Treatment Facility Phase I Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.