BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 12, 2026 at 7:00 PM

Updated January 13, 2026

Site work and paving for a road / highway in Dade City, Florida. Working plans call for site work for a road / highway; and for paving for a road / highway.

**As of January 12, 2026, bids were canceled. No definite date for the rebid.** The City of Dade City is seeking quotes for the creation of construction documents, specifications and opinion of probable costs for the limits of the 7th Street Streetscape project from Church Avenue to Pond Avenue. 7th Street Streetscape Project 2509-pl The City of Dade City Has Received a Grant in the Amount of $300,000 From the State of Florida to Be Used to for: Landscape and Pedestrian Improvements Along 7th Street From Pond Avenue on the North to Church Avenue on the South. Beginning at Church Avenue, 7th Street Will Become One Lane in Each Direction With New Diagonal Parking Located on the Northbound Side of the Street and Parallel Parking Located on the Southbound Direction. The Conversion of the Existing Parallel Parking to Diagonal Parking in the Northbound Direction Will Add 48 New Parking Spaces. As Currently Proposed the Center Turn Lanes Will Be Eliminated. To Accommodate the Removal of the Turn Lanes, the Timing of the Signals Will Be Modified to Allow All Traffic Moving in One Direction to Go, Then the Opposite Direction Will Be Given a Green Light to Proceed. This Will Help to Ensure That Traffic Can Flow Without Having to Wait for Cars to Make Left Hand Turns Across Incoming Traffic. With the Conversion to Diagonal Parking, New Landscape Planter Areas Will Be Created at the Ends of Each Parking Area. In Addition, New Landscape Areas Will Also Be Added to the Intersections to Narrow the Crosswalk Areas for Pedestrians, Creating Much Shorter Crossing Distances Across 7th Street. To Further Increase the Number of Trees in the Downtown Area, New Mid-parking Tree Wells With at Grade Tree Grates Will Be Added Every 2-3 Parking Spaces. The Placement of These Trees Will Help to Bring the Canopy of the Trees Closer to the Center of the Roadway Creating Greater Shade Potential. This Placement Also Allows for Healthier Tree Growth as They Are Not Impeded by the Adjacent Buildings. Additional Florida Friendly Landscaping That is Low Maintenance Will Be Planted Throughout the Project. All Crosswalks Within the Project Area Will Be Constructed of a Stamped, Colored Asphalt to Mimic the Historic Brick of Downtown. This Material Will Have Less Maintenance Than Traditional Brick. The Colored Stamped Asphalt Will Be More Cost Effective Than Stamped Concrete. All of the Existing Crosswalks Will Remain, and New Pedestrian Crosswalks Will Be Added at Pineapple Sumner and Pond Avenues. The City of Dade City is an Equal Opportunity Employer and Reserves the Right to Reject Any or All Bids.

Final Planning

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2025

July 12, 2026

Project location map

7th St, Dade City, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.