BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in East Fayetteville, North Carolina. Completed plans call for site work for a water / sewer project.

Drilling for the authorized subsurface exploration was performed during the period February 25 through March 5, 2021 in conformance with our proposal RD22783R1, dated November 23, 2020. Occasionally some modification to work scopes appearing in our proposals is required to provide for proper evaluation of encountered subsurface conditions. Modification to the scope for this project has included performance of 10 additional moisture content tests for evaluation of subsurface moisture conditions. No other modifications to the work scope were required to complete this work. The purpose of the geotechnical exploration has been to assess general subsurface conditions at specific boring locations and to gather data on which to base a preliminary geotechnical evaluation with respect to the project. Subsurface exploration for this project consisted of thirteen (13) soil SPT borings and three (3) Kessler DCP borings; soil classification has only been performed in the SPT borings. The site was drilled using a CME 550X ATV drill rig equipped with a manual hammer; DCP borings were performed with a hand auger and ASTM compliant dynamic cone penetrometer. Soil boring sites were field located by a representative of our staff using a Garmin GPSmap 64. As such, boring positions appearing on the Boring Location Plan, attached to this report, should be considered approximate. A boring plan was provided to the client prior to commencement of field work. Questions regarding this Request for Qualifications shall be submitted in writing to the attention of Tanya Hazlett via e-mail to tanya.hazlett@faypwc.com, no later than 5:00 p.m., February 28, 2023 Interested firms must email Tanya Hazlett, PWC Procurement Advisor at tanya.hazlett@faypwc.com of their intent to attend. It is the intent of PWC to have the Project substantially complete by April 2027. The milestone completion dates are as follows: o February 2026-Stabilize embankment and maintenance road improvements. o February 2027-Lining the outfall. The estimated budget for this work is $8,600,000

Post-Bid

Water / Sewer

$8,600,000.00

Public - City

Site Work

3

8

9

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
76
Bidding Soon
1,332
All Active Projects
519
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2023

May 29, 2023

img_map_placeholder

Multiple Locations, East Fayetteville, NC

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.