BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Hingham, Massachusetts. Completed plans call for the construction of a 126,385-square-foot, three-story above grade educational facility; and for site work for a educational facility.

Agency Name and Address Hingham, Town of Public Schools 220 Central Street Hingham MA 02043 Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. This is a Request for Qualifications (RFQ) for Elevator Filed Sub Bid Contractors under M.G.L. c. 149, for construction of a new Hingham Elementary School and associated site improvements (126,385 SF New Construction, 3 stories, 680 students) H210802ECS The Project consists of: Construction of a new 3 story building and associated site improvements for a 126,385 SF new elementary school facility. Work covered by the Contract Documents: The work to include, but to limited to, the installation of a complete ready for use facility in a phased occupancy as indicated to the limits and as indicated on the documents. Refer to Section 01 10 11 Project Milestones for the requirements of the phased occupancy which facilitates the Owner schedule of an un-interrupted educational plan. Work force requirements: 1. The General Contractor acknowledges the stringent requirements of the Owner with respect to the dates of Substantial Completion for various Portions of the Work, and recognizes that the construction schedule may require that work proceed on an accelerated basis. The General Contractor therefore agrees that the Work of his own forces and of his Subcontractors shall be performed on an overtime and/or double-shift basis if and to the extent necessary in order that the construction schedule be met. 2. Neither overtime nor double-shift work shall be grounds for any claims for compensation to the General Contractor or subcontractor. If the nature of overtime of double-shift work requires that the Owner and their agents provide personnel to operate the facility at times when they would not normally be present, such personnel costs shall be borne or reimbursed by the General Contractor

Award

Educational

$73,000,000.00

Public - City

New Construction, Site Work

483

61

124

3

Subscribe For Documents

64 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
272
Active Projects
136
Bidding Soon
2,567
All Active Projects
1,077
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2023

May 29, 2023

img_map_placeholder

55 Downer Ave, Hingham, MA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.