BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Mountain Village, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of February 17, 2023, project was awarded to Telluride Gravel, awarded amount is $242,530.50.**  Mountain Village Road Improvement; Resurface, San Joaquin Road from Prospect Creek Drive to the San Joaquin cul-de-sac. Provide materials, equipment and labor to resurface and shoulder: San Joaquin Road from prospect Creek Drive to the cul-de-sac with a 2" asphalt overlay. Approximately 3860 LF of road 22' wide with a 2" asphalt overlay. Prospective contractors will be responsible for measurement of roads to be resurfaced and offer a fixed bid price for the entire project. Shouldering shall be included for all sections of roads that do not have curb and gutter. A separate price for the overlay of each road should also be itemized in the bid. The asphalt mix design shall meet Colorado Department of Transportation (CDOT) standards for SX 75 PG 58-28 with2}yo RAP. Warm mix will be required. The overlay course shall be placed so as to remove irregularities such as wheel ruts and reestablish the crown (2%) as needed. Pavement shall be compacted by rolling with both steel drum and pneumatic tire rollers. Compaction must be in a train like fashion with first a steel drum break down roller followed by an intermediate rubber tire roller and finally by a steel drum finish roller. pavement shall be compacted to a density of 92-96 percent of the daily theoretical maximum specific gravity determined according to CP51 of CDOT specifications. Quality control testing of compaction density to be performed by contractor and results provided to TMV daily. Frequency of testing to be discussed during site walk. All necessary grinding of asphalt surfaces required to match up to existing surfaces will be performed by contractor. The grindings are to be stockpiled on site to be used for shouldering. To be discussed during site walk. New shoulder material shall be 3/a" road base spread 2ft wide from edge of pavement and compacted. Cleaning and surface prep before application shall be the responsibility of TMV. Traffic control shall be the responsibility of TMV. A project work schedule shall be submitted by contractor with the RFP package. It is anticipated that construction will be a Monday - Saturday schedule with Sundays as a special approval case only. Water will be provided by TMV. All staging will be on site. A ll permits will be the responsibility of the TMV. Proof of insurance shall be provided by contractor to the Town prior to commencement of work, showing the Town as additional insured, in a minimum amount of $2,000,000 per occurrence. A current business license will be required before work can commence. Once the project has started the contractor must complete the project without pulling off the job unless approved by Town of Mountain Village. Violation of this requirement will result in penalties assest at the end of the project. Blackout no work dates due to festivals: June 14-19 Bluegrass July 1-5 Fourth of July Proposal will be awarded Februaryl6th,2023 Term of project: Date of award thru August 30't,2023

Award

Roads / Highways

$242,531.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
4
Bidding Soon
74
All Active Projects
25
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 14, 2023

March 16, 2023

img_map_placeholder

San Joaquin Rd, Mountain Village, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.