BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Summerville, South Carolina. Completed plans call for the renovation of a 3,112-square-foot educational facility.

Dorchester School District Two is seeking proposals from qualified firms to renovate the girls and boys locker rooms at Gregg Middle School. Scope of work includes selective demolition, new interior partition construction, accessibility modifications, life safety enhancements, interior finish alterations and mechanical, electrical and plumbing system replacements. PROJECT LOCATION: 500 Greenwave Boulevard, Summerville, SC 29483 Dorchester School District Two, hereafter referred to as "District", is soliciting bids from qualified firms to provide construction for the renovation of Gregg Middle School boys and girls locker rooms. The area defined by the scope of work is approximately 3,112 square feet. The renovation of the existing building includes selective demolition, new interior partition construction, accessibility modifications, life safety enhancements, interior finish alterations, mechanical, electrical, and plumbing system replacements. Existing interior finishes shall be removed and replaced including floor tile, wall tile, ceiling tile, and paint. Existing interior doors shall be removed and replaced. Questions regarding this solicitation should be directed to www.moseleyarchitects.com at the top of the website select "Bidding", and click on the project name. Deadline for questions and/or substitution requests is February 20, 2023 at 5:00 pm. Reponses to questions will be in the form of an addendum posted to the website and email notifications to the plan holder Summary of Work 1. The area defined by the scope of work is approximately 3,112 square feet. The renovation of the existing building includes selective demolition, new interior partition construction, accessibility modifications, life safety enhancements, interior finish alterations, mechanical, electrical, and plumbing system replacements. Existing interior finishes shall be removed and replaced including floor tile, wall tile, ceiling tile, and paint. Existing interior doors shall be removed and replaced.

Bid Results

Educational

$539,000.00

Public - County

Renovation

23

23

20

6

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
76
Bidding Soon
718
All Active Projects
341
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2023

March 31, 2023

img_map_placeholder

500 Greenwave Blvd, Summerville, SC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.