BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of a mixed-use development in Tomball, Texas. Completed plans call for the construction of a educational facility; for site work for a educational facility; warehouse / distribution facility; and warehouse / distribution facility.

A. The work comprises the construction of Agricultural Show Arena for Tomball Independent School District, Tomball, Texas, as shown on the drawings and described in the specifications. The work will be done under one lump sum contract. B. Indication on the drawings or mention in the specifications of articles, materials, operations or methods requires that the Contractor provide each item indicated or mentioned of the quality or subject to the qualifications noted, and perform according to the conditions stated each operation described and provide therefor all necessary labor, equipment, services and incidentals. 1. Subcontractors are responsible for examining the architectural drawings for structural, mechanical, electrical, and plumbing items. Items shown on these drawings shall be furnished by the appropriate subcontractor. A link to the digital copies of the drawings and project manual may be obtained from Rayce Boyter, VLK Architects, Inc., 20445 SH 249, Suite 350, Houston, TX 77070, e mail: rboyter@vlkarchitects.com. A link to the digital copy of the addenda will be e-mailed to the current list of plan holders. Proposal Documents will be available after February 6th, 2023. All Offerors submitting a proposal are encouraged to attend the proposal opening. Subcontractors and suppliers intending to submit proposals to Construction Offerors are required to prepare their proposals based on a complete set of proposal documents. If after reviewing the complete set of proposal documents, Subcontractors and supplier offerors desire to purchase individual drawings and specification sections for their proposal convenience, they may do so by ordering the specific drawings and specifications directly from the reproduction company. Each offeror purchasing a partial set of proposal documents is responsible for determining exactly which documents he requires and is responsible for all costs associated with printing and delivery. Subcontractors and suppliers exercising this option must agree to do so on the basis that 1) all documents shall be returned to the Architect, without refund, after submitting a proposal and 2) documents shall not be used on other projects. Successful Subcontractors and supplier offerors may retain their Proposal Documents until completion of the construction. All Offerors submitting a proposal are encouraged to visit the site. Furnish, install, and adjust vibration isolation. All questions are due by Friday, February 14th, 2023 @ 5:00 p.m. C.S.T. Estimated cost of construction is approximately $4,000,000.00 A. The Surge Protection Device (SPD) covered under this section includes all service entrance type surge protection devices suitable for use as Type 1 or Type 2 Devices per UL1449 4th Edition, applied to the line or load side of the utility feed inside the facility. The unit shall be connected in parallel with the facility's wiring system. The unit shall be manufactured in the USA by a qualified manufacturer of suppression filter system equipment, which has been engaged in the commercial design and manufacture of such products for a minimum of five years. B. Contractor shall provide all labor, materials, equipment and incidentals as shown, specified and required to finish and install surge protection devices. A. The extent of site lighting required is indicated on the drawings and schedules and by the requirements of this Section and Section 26 05 00 General Electrical Provisions. B. Poles and Standards specified in this Section are for outdoor use for the support of luminaires and include the following: Aluminum and/or steel. A. Work covered by this Section shall consist of furnishing labor, equipment, supplies, materials tools and testing unless otherwise specified, and in performing the following operations recognized as necessary for the installation, termination and labeling of ground and bonding infrastructure as described on the drawings and/or required by these specifications. A contract awarded in response to this RFP will be for General Contracting Services for a Agricultural Show Arena. The Owner has defined project completion dates for the anticipated work.

Award

Warehouse / Distribution

$5,426,000.00

Public - City

New Construction, Site Work

96

31

2

2

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
62
Bidding Soon
2,715
All Active Projects
1,050
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.