Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for an educational facility in Chicago, Illinois. Completed plans call for site work for a educational facility.
Questions Due Date: Feb 7th 2023, 2:30 PM CST Provide Labor and Materials: o Overview of Project -The Existing bi-level fountains are configured as lo-hi which is no longer manufactured. -Replacement requires installation of two individual fountains in 7 different locations. -Replace 9 individual drinking fountains requested. - 23 fountains will be installed. Seven Lo-Hi Drinking Fountains, various locations. -Shut down water to fountains. -Demolish 1 Lo-Hi style drinking fountain. -Re-pipe fountain internal drainage to Lo-Hi style configuration with continuous waste piping. -Install 2 new Elkay VRCDS single drinking fountains. Various Trades Invitation to Bid -Units to be mechanically operated, unfiltered and unchilled. - Isolate water fountains. - Use existing angle stops. - Check for leaks once installed. -When finished test for proper operation. -9 Individual fountains -Shut down water to fountains. -Demolish 1 single drinking fountain. -Install 1 new Elkay VRCDS single drinking fountain. Unit to be mechanically operated, unfiltered and unchilled. -Once complete test for proper operation. -Secure job site overnight if work is not completed in one day. -If building or CPS properties are damaged during construction, contractor to replace and/or repair as necessary. -Provide necessary labor and materials to fix/correct issues preventing any or all the projects to be marked as completed. -All work shall be coordinated with the Board authorized representatives to complete in an agreed upon time frame. -Contractor is to remove and dispose of materials torn out and any construction debris. -All trash must be removed off-site by contractor. -Clean the surrounding area and make sure all is swept of debris. -All questions/requests must be received two (2) business days prior to bid closing.
Bid Results
Educational
$40,965.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 28, 2023
March 30, 2023
9822 S Exchange Ave, Chicago, IL
Related To This Project
Chicago, IL
Bid Date: Feb 21 2023
Chicago, IL
Bid Date: Feb 23 2023
Chicago, IL
--
Chicago, IL
Bid Date: Feb 16 2023
Chicago, IL
Bid Date: Apr 19 2023
Chicago, IL
Bid Date: Feb 15 2023
Chicago, IL
--
Chicago, IL
Bid Date: Feb 28 2023
Replace Air Handlers and Booster Coils - Student Center East (SCE) Division 03, 04, and 05 - 4967944
Chicago, IL
Bid Date: Feb 22 2023
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.