BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Columbus, Ohio. Conceptual plans call for the renovation of a educational facility.

As of April 3, 2024, this project has been cancelled. *The closed solicitation has been included below for reference: For Arps Hall Exterior Windows Replacement In the subject line, include the project number and name for RFQ you are responding to. See Section J of this RFQ for additional submittal instructions. Submit all questions regarding this RFQ in writing to Lindsay Conkel at conkel.18@osu.edu with the project number included in the subject line (no phone calls please). Questions will be answered and posted to the Opportunities page on the OFCC website on a regular basis until one week before the response deadline. The name of the party submitting a question will not be included on the Q&A document. A full exterior window replacement on the East Wing of Arps Hall with new operable aluminum windows -dark finish. Approx. 207 windows. This work will include equipment, demo, abatement of caulking, new window installation, new caulking and joint sealants, new window sills, drywall return patching, new metal panels similar to existing to cover columns, new metal louvers. A new storefront entry with automatic operators and card readers at East Wing - East Elevation. This project will include landscaping repair from any equipment damage This project has the potential to expand to include similar replacement of West Wing exterior windows, a new West Wing - West elevation storefront with automatic operators/card readers and curtain wall replacement at West Wing - West Elevation. The project and construction budget as listed in this RFQ is estimated. This request is for the Architect/Engineer (A/E) to provide design and project management to establish construction documents and construction management. This project is advertised with an appropriately developed Program of Requirements (POR), upon award of the Agreement, commence with Design. The selected A/E will be required to sign the standard agreement. No modifications to the requirements in the agreement will be accepted. During the construction period, provide not less than 2 hours (excluding travel time) on-site construction administration services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having relevant and appropriate types of construction administration experience. The project team (Owner / A/E / Contractor) will be required to utilize e-Builder, the University's Project Management System, for all compatible services required by the University. Professional Services Start: 03/ 23 Construction Notice to Proceed: 08/ 23 Substantial Completion of all Work: 11/ 23 Professional Services Completed: 01/24 EDGE Participation Goal Percent of initial Total A/E Fee: 5.0% The method of contractor selection has not been determined at this time.

Project Abandoned

Educational

$1,143,614.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
93
Bidding Soon
2,489
All Active Projects
986
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 4, 2024

January 24, 2024

img_map_placeholder

1945 N High St, Columbus, OH


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.