Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a water / sewer project in Lake Elsinore, California. Working plans call for site work for a water / sewer project; and for the renovation of a water / sewer project.
Per the owner, as of February 8, 2024, construction on this project may be done by in-house staff. The owner states that a timeline for bidding has not been determined and construction is anticipated at the end of March 2024. Closed solicitation has been included below for reference. ................... Elsinore Valley Municipal Water District (EVMWD) is a publicly owned water and sewer service agency with approximately 46,000 water services and 36,600 sewer service connections, serving a population of approximately 157,000. The project is within EVMWD's boundaries and is located within the City of Lake Elsinore. This RFP solicits engineering design services to for the Back Basin Groundwater Treatment Plant Chemical Upgrades Project. EVMWD owns and operates the Back Basin Groundwater Treatment Plant (BBGWTP) located at 18529 Malaga Road, Lake Elsinore, CA 92532 (refer to location map included as Attachment A). The BBGWTP reduces the concentration of arsenic in the supply well water to a lower arsenic concentration that meets EPA's Maximum Contaminant Level (MCL) of 10 parts per billion (ppb). The facility was constructed in 2009 and has a capacity of 3.5 mgd with future build-out capacity to 5.0 mgd (refer to record drawings included as Attachment B) The plant is supplied by two wells, Cereal 3 and Cereal 4. BBGWTP uses a coagulation-filtration process to remove arsenic from the well water. Sodium hypochlorite and ferric chloride are injected into the raw water line at the head of plant. Sodium hypochlorite acts as an oxidant, oxidizing arsenic (III) to arsenic (V), which binds with ferric hydroxide. Ferric hydroxide is created when ferric chloride is flash-mixed in the presence of sodium hypochlorite. The arsenic-ferric hydroxide compound creates a floc, which is filtered out through the granular media (anthracite and sand) in the pressure filter vessel. In March 2020, Infrastructure Engineering Corporation completed an alternatives evaluation for re-routing the existing chemical feed lines as part of the Back Basin Groundwater Treatment Plant Repairs of Filters No. 5 and No. 6 Construction Scope of Work Technical Memo (included as Attachment C). The Consultant shall review the report and provide a recommendation and cost as part of the Preliminary Design Report Q&A Deadline 03/02/2023 10:00 AM (PST) EVMWD intends to initiate this project on May 2023, anticipating completion on November 2024 The method of Contractor Selection has not been Determined at this time.
Final Planning
Water / Sewer
$250,000.00
Public - County
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 25, 2024
18529 Malaga Rd, Lake Elsinore, CA
Related To This Project
Lake Elsinore, CA
Bid Date: Jan 10 2022
Lake Elsinore, CA
Bid Date: Aug 08 2024
Lake Elsinore, CA
Bid Date: Mar 30 2023
Lake Elsinore, CA
Bid Date: Mar 29 2023
Lake Elsinore, CA
Bid Date: Apr 05 2023
Lake Elsinore, CA
Bid Date: Apr 17 2023
Lake Elsinore, CA
Bid Date: Apr 07 2023
Lake Elsinore, CA
Bid Date: Jul 27 2023
Lake Elsinore, CA
Bid Date: Feb 28 2023
Lake Elsinore, CA
Bid Date: Mar 20 2023
Lake Elsinore, CA
Bid Date: Jan 16 2024
Lake Elsinore, CA
Bid Date: Jan 31 2023
Lake Elsinore, CA
--
Lake Elsinore, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.