Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a mixed-use development in Orange, California. Completed plans call for site work for a playground / park / athletic field; water / sewer project; for the renovation of a playground / park / athletic field; and water / sewer project.
**As of March 23,2023 , this project has not yet been awarded. The project is expected to be awarded on April 11,2023.** The Contractor shall be registered with Department of Industrial Relations (DIR), State of California per Labor Code Section 177.1(a) at the time of bid. This project is subject to compliance monitoring and enforcement by DIR. All bids will be tabulated and presented to the City Council at the meeting of April 11, 2023. Contact: Paul Miller 714-744-6491 . All questions regarding this 'EL CAMINO REAL PARK BOOSTER PUMP INSTALLATION' are to be submitted by email to Paul Miller by March 2, 2023 by 12:00 p.m. SCOPE OF WORK AND PROJECT SPECIFICATIONS SCOPE OF WORK: SITE PREP: 1. Supply all labor & equipment necessary for the installation/construction of the new booster pump & irrigation modifications/improvements and other related work. 2. Supply temporary barrier fencing during construction. Barrier fencing to be six feet tall chainlink, free-standing type. Fencing to surround entire area of construction. DEMOLITION: 1. Remove existing pump, electrical equipment, irrigation fittings and equipment and return to the City. 2. Provide all demolition/removal of concrete pads, soil, and debris within the designed footprint of work improvement area. 3. All debris must be removed off site at the contractor's expense. 4. Provide the removal (off site) of all concrete, concrete blocks, metal scrap and footing soil at the contractor's expense. 5. Protect in place existing amenities to remain in place. CONSTRUCTION: 1. Provide and install new Watertronics Irrigation Booster Pump Station specified in Exhibit A, Plans and Specifications, including new concrete pad. 2. Concrete pad will be dimensions noted in pump specification. Concrete pad will be minimum 3 1/2 inches thick, and minimum 2500 PSI compression strength. 3. Provide the re-connection of all existing irrigation components (backflow, main lines, lateral lines, flow sensors, control wires, etc.) that may/will be disconnected or disturbed during this construction process. 4. Repair of all broken or disconnected irrigation components that occurs in any portion of the completion of this agreement will be repaired by the contractor to the satisfaction of City representative. 5. Provide the installation of one (1) marine grade aluminum enclosure, per detail. 6. Use existing electrical source from existing pump. Add new conduit as needed. 7. Excavation backfill shall be native soil, placed in twelve-inch lifts. Compaction is 90% for hardscape (i.e. walkways, picnic pads, basketball and tennis courts); and 85% in areas to be planted. Place topsoil at top six inches over trenches in planted areas. Upon completion, all trenches and excavation shall be filled flush with adjacent finish grades. 8. All removed and damaged turf will be replaced with West Coaster Tall Fescue sod from West Coast Turf or equivalent approved by City representative. PROJECT DESCRIPTION: The City of Orange, CA, a Municipal Corporation, is requesting qualified contractors to provide bids in accordance with the specifications prepared by City of Orange Staffing. All work shall also conform to City of Orange codes, ordinances and standards. The work will generally include, but not be limited to: Provide all work (labor, materials, and specified booster pump) necessary to install an irrigation booster pump, provide miscellaneous demolition, masonry, electrical, planting and irrigation work.
Bid Results
Water / Sewer
$60,000.00
Public - City
Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 9, 2023
April 10, 2023
400 N Main St, Orange, CA
Related To This Project
Orange, CA
Bid Date: Apr 11 2023
Orange, CA
Bid Date: Mar 01 2023
Orange, CA
Bid Date: Mar 10 2023
Orange, CA
Bid Date: Mar 09 2023
Orange, CA
Bid Date: Mar 16 2023
Orange, CA
Bid Date: Mar 20 2023
Orange, CA
Bid Date: Mar 14 2023
Orange, CA
Bid Date: Mar 20 2023
Orange, CA
Bid Date: Mar 09 2023
Orange, CA
Bid Date: Mar 09 2023
Orange, CA
Bid Date: Mar 02 2023
Orange, CA
Bid Date: Mar 02 2023
Orange, CA
Bid Date: Feb 22 2023
Orange, CA
--
Orange, CA
Bid Date: Mar 20 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.