EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 12, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a fire / police facility in Ewing, New Jersey. Completed plans call for the renovation of a fire / police facility.

As of April 12, 2023, this project has not yet been awarded. A timeline for award has not yet been established. Purchase and Installation of a Source Capture Exhaust Extraction System for All Front-line Apparatus for the Trenton Fire Department and Emergency Services It is the intent of the Trenton Department of Fire and Emergency Services to install a source capture exhaust extraction system for all front-line apparatus. This system will be installed in seven (7) fire stations, covering a total of eighteen (18) vehicles. Once installed, this system will protect the health and safety of firefighting personnel and the public from the hazards of vehicle exhaust. This project shall be completed in 120 calendar days from "Notice to Proceed". Three-to five-year warranty required on all parts and labor. FIRE STATION'S LOCATIONS Fire Headquarters- 244 Perry St., 8 vehicles Station 1- 460 Calhoun St, 3 vehicles Station 3- 720 S. Broad St., 2 vehicles Station 6- 561 N. Clinton Ave., 1 vehicle Station 7- 502 Hamilton Ave., 1 vehicle Station 8- 698 Stuyvesant Ave., 1 vehicle Station 9- 1464 W. State St., 2 vehicles Bid Guarantee (Bid Bond or Certified/Cashier's Check) Performance Bond and Labor and Material Payment Bond (Required from the Awarded Contractor) Questions must be submitted in writing to igarcia@trentonnj.org

Bid Results

Fire / Police

$215,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Electrical Utilities, Utility Substations

Find More Local Projects

Within 75 Miles of This Project
424
Active Projects
217
Bidding Soon
4,814
All Active Projects
1,996
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2023

March 30, 2023

img_map_placeholder

Multiple Locations, Ewing, NJ

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Purchase and Installation of a Source Capture Exhaust Extraction System for All Front-line Apparatus

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.