EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 28, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of a fitness / recreation center in Tecumseh, Oklahoma. Completed plans call for the renovation of a 16,835-square-foot fitness / recreation center.

The Work consists of the following: 1. The Work includes all labor and materials for the complete removal of the existing gym floor, installation of a new wood gym floor assembly, installation of volleyball inserts and covers, as described in the Contract Documents. 2. Coordination of Work provided by Owners Sub-Contractors may be required. Project will be constructed under a single prime contract. For Replacement of the Gymnasium Floor Bond Percentage 5.00% Cashiers Check, Certified Check, Irrevocable Letter of Credit, or Paper Surety Bid Bond In submitting the bid, it is understood that the right is reserved by the State of Oklahoma to reject any and all bids, and it is agreed that this bid may not be withdrawn for a period of thirty (30) days after the date of closing of same. Work is to start within ten (10) days after receipt of Notice to Proceed/WORK ORDER. If the bid exceeds $50,000, it shall be accompanied by a certified check or a cashier's check made payable to the State of Oklahoma, or a Corporate Surety Bond of a surety company duly authorized to do business in the State of Oklahoma, in the sum of five percent (5%) of the total amount of the bid (unless otherwise specified in the bid documents) which is submitted as bid security, conditioned upon the Bidder's entering into a contract with the State of Oklahoma in accordance with the terms of the bid. It is agreed that said bid security of the successful bidder will constitute liquidated damages, and not a penalty for the failure of the bidder to enter into a contract in accordance with this bid. Base Bid: To furnish all necessary Project Management, Superintendence, labor, machinery, equipment, tools, materials, supplies, and appurtenances to complete all the Work upon which is within these Contract Documents. Any required overtime and similar costs to complete the Project within the above stated days, is included.

Award

Fitness / Rec Centers

$98,956.00

Public - State/Provincial

Renovation

10

15

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 09 - Finishes

Division 09 - Finishes

Flooring, Wood Flooring, Resilient Flooring, Wall Finishes, Wall Coverings, Painting and Coating
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Seal Coats

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
61
Bidding Soon
692
All Active Projects
342
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2023

April 17, 2023

img_map_placeholder

700 S 9th St, Tecumseh, OK

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

COJC Gym Floor Replacement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.