BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Solana Beach, California. Completed plans call for site work for a playground / park / athletic field.

Engineers Estimated Cost: $0 to $18,000. 1. Remove and dispose of existing basketball backboard, goal, and arm. Existing pole will remain in place. 2. Furnish and install FirstTeam basketball extension arm, backboard (FT222H), goal (FT186) and hardware onto existing pole. 3. Waterblast, using a 3500 to 5000 PSI hydroblaster, or diamond grind existing surface. Expose all surface spalls, pop-outs, clean out existing cracks, and remove any bubbling or peeling of existing surface. 4. Patch all cracks, visible pop-outs, and spalls, using court patch binder and grind or sand flush with slab. 5. Surface playing area with the Acrylic System for true ball bounce a. Clean and prepare existing surface. b. Apply acrylic concrete primer to all exposed concrete. c. Apply one (1) coat of sand-filled acrylic resurfacer, giving surface a smooth, even, uniform finish. d. Apply two (2) coats of sand-filled acrylic color for court speed. 6. Stripe court, utilizing line primer for sharper edges, as per current game specifications, color white.

Bid Results

Playgrounds / Parks / Athletic Fields

$17,855.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
473
Active Projects
234
Bidding Soon
3,134
All Active Projects
1,450
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 14, 2023

April 13, 2023

May 25, 2023

img_map_placeholder

To Be Determined, Solana Beach, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.