BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Woodbine, New Jersey. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of March 28, 2023, project was awarded to Command Co., Inc., awarded amount is $506,849.50. Work under this project shall include furnishing all material, equipment and labor required to construct pedestrian and bikeway safety improvements as shown on the plans and described in the specifications. Major components of the completed project include construction of a pedestrian and bikeway path along the north side of Sumner Avenue located between Heilprin Avenue and Fidler Road. All bids must be accompanied by bid security. The bid security shall be in the form of a certified check, cashier's check, or bid bond executed by the principal and surety company attorney in fact and witnessed and attested to with the power of attorney attached, in the amount of 10% ofthe amount of the bid but not to exceed $20,000.00 and made payable to 'Borough ofWoodbine*. Contract Documents may be examined at the office of the Borough of Woodbine, Project Engineer, Ralph Petrella, Ji,, Van Note - ITaivey Associates, Inc,, 211 Bayberry Drive, Suite 2-E, Cape May Court House, New Jersey 08210 or at Woodbine Borough Hall. In addition to the certified check, cashier's check or bid bond as bid security, each bid must be accompanied by a Non-Collusion Affidavit and a Consent of Surety of a surety company licensed to do business in the State of New Jersey and acceptable to the Borough ofWoodbine that in event of an award of a Contract to the bidder, said surety will furnish the required bonds in the sum of the full amount ofthe bid as set forth and as required herein. Bidders are required to comply with the subcontractor identification requirements ofthe Local Public Contract Law (40A; 11-16). The successful Bidder must furnish a 100% Performance Bond and 100% Labor and Material Payment Bond in conformity with the requirements ofthe Contract Documents. The successful bidder will be required, upon final payment, to furnish a General Maintenance Bond acceptable to the Borough of Woodbine, in conformity with the requirements ofthe Contract Documents. Should the successfulBidder to which this Contract is awarded fail to comply with the above provisions as to the submission of the required bonds, fully execute or to execute the Contract within the time required herein, the Owner may at its sole discretion, declare the successful Bidderin default, and shall be entitled to retain the bid security. Bidders are required to comply with the requirements ofMew Jersey P.L. 1975, C. 127 (N.J.A.C, 17:27), Public Works Contractor Registration Act (PWCRA) P.L. 1999, C.238-NJ.S.A. 34:11-56.48 et seq, Affirmative Action; P.L. 1963, C.150, Prevailing Wage Act; and P.L. 1975 C.33, Disclosure of Interests, as amended and supplemented. Under the statutes of the State of New Jersey, state wage rates will apply to this contract. The Contractor will be required to pay the wage rate for each classification oflabor including appropriate fringe benefits in accordance with State Wage Rate Determinations. The successful bidder will be required to comply with all provisions of Executive Order 11246 of September 24, 1965, and all ofthe rules, regulations, and relevant orders ofthe Secretary ofLabor. The Borough ofWoodbine is exempt from the payment of sales tax and use taxes in accordance with N.J.S.A. 54J2B-8 and NJ.S.A. 54J2B-9. The Borough of Woodbine reseivcs the right to reject any bid pursuant to law and all bids may be rejected pursuant to NJ. SA. 40A: ] 1 -13.2, No bid may be withdrawn for a period of sixty (60) days after the date set for the opening thereof. Each proposal or bid must be submitted in accordance with the terms ofthe aforesaid specifications and must be made on standard proposal forms contained in the specifications. It must be enclosed in a sealed envelope, bearing the project name and the name and address of the bidder and be delivered at the place on the hour above named. Bid Results Base Bid Option #1 Command Co., Inc - $474,449.50 Base Bid Option #2 Command Co., Inc - $428,847.75

Award

Sidewalks / Parking Lot

$506,850.00

Public - City

Paving, Site Work

20

12

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
61
Bidding Soon
1,516
All Active Projects
644
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2023

March 24, 2023

img_map_placeholder

Sumner Ave, Woodbine, NJ

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.