Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Miami, Florida. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; and sidewalk / parking lot.
Contractor shall construct new 150' x 130' asphalt foundation with concrete curb apron/perimeter for placement of six (8) pickleball court's (per owner shop drawing) to include post/nets, lined for play per USA Pickleball Association (USAPA) guidelines/specifications. It is the responsibility of the Contractor to verify all pricing and to modify their adjustment factors accordingly to inflation or material cost fluctuations prior to submitting a final Base Bid price. Failure to honor pricing could impact the ability of the firm to receive County Business in the future as it will become a responsibility issue in future evaluations. Bids must be submitted pursuant to all the requirements set forth in the Bid Documents. Line for play per USA Pickleball Association (USAPA) court guidelines/specifications. Contractor shall install 4' FT fence system between the pickleball courts leaving 5' space from edge of court. perimeter fence (See Fence Dimension Attachment). The 4' FT High divider fencing shall have a Yellow Corrugated Fence Cap at 4 1/2 " diameter covering the knuckle-to-knuckle fabric finish & top rail of divider fencing 1.14) Contractor shall complete asphalt walkway placement per owner drawing. Asphalt walkway 130'LF x 10' (approximately 1,300 SF) with ADA Accessible Ramp transition from existing asphalt to new courts on North Side. Note that work is further described in the contract documents and within the plans listed in Project Volume I 00800 Supplemental General Conditions Article 1.28. PROJECT LOCATION: Tropical Park-7900 SW 40 St. Experience Requirement: Bidder or vendor key personal experience shall have completed at least two (2) projects of similar size and scope in accordance with Resolution No. R-1122-21. Bidder shall provide evidence of this experience; project names; dollar values and contract information for verification purposes. The experience of the bidding or proposing Contractors' key personnel will be considered in assessing the Contractor's experience. BID DOCUMENTS: Bid Documents will be sent to all bidders Contractor must refer to the Request for Price Quotation (RPQ) and associated project documents for the detail Scope of Work. If you have any questions, contact Jose Lopez Jr at 786-315-2124. Performance & Payment Bond Required: YES Bid Bond Required: YES Anticipated Start Date: 3/1/2023 Calendar Days for Project Completion: 120 Base estimate is $246,200.00. SBE-Construction Subcontractor (SBE-Cons) goal of 19.09% Pickleball Association (USAPA) guidelines/specifications. 1) Contractor shall be required to submit topographical survey to insure finish court surface is consistent elevation north/south-east/west to while maintaining slope required per USA Pickleball Association (USAPA) court guidelines/specifications. 1) Contractor shall reference owner site drawing for foundation location, foundation shall be at grade elevation with slope per owner shop drawing detail, shoulder dressing shall apply pending existing site ground elevations. 2) Subgrade Preparation to include removal of all rock, vegetation (including root systems), debris, and unsuitable topsoil from the area. To prevent future growth, treat the subgrade with an approved soil sterilant. The subgrade must be shaped to meet true lines and elevations to be compacted not less than 95 percent of maximum laboratory density. The surface of the compacted subgrade must not vary more than 3/4 inch from the established grade. 3) Base construction for asphaltic concrete (finish surface) rock base material must be placed on the prepared subgrade in equal lifts of a thickness no more than 6 inches or less for a total thickness of 12". The material must be spread and compacted to the required thickness and density as specified shown per owner's drawings. The surface of the completed base must not deviate more than 3/8 inch when measured with a 10-foot straight edge but must slope 1 inch per each 10 feet on a true plane from side to side, end to end, or corner to corner as indicated. Slope from existing asphalt to new court concrete apron on North Side to create a gradual transition to new courts. 4) Concrete header curb to perimeter (owner drawing detail) of foundation to be constructed with 28 day 3,000 PSI concrete, sub base to be well compacted and/or tested with a 98% minimum density or LBR 40 based on AASHTO T-180 modified proctored test. 5) Finish surface asphaltic concrete course to include tack coat applications, tack coat shall be heated and applied in a thin uniform layer at a rate of .03 and .15 gallons per square yard. Asphaltic concrete placement shall be compacted to the required thickness and density to a minimum 1" inch thick type S-1 to all areas. 6) Apply (4) coats color concentrate finish to new surface. (Green, Blue as per parks standard) per USA Pickleball Association (USAPA) court guidelines/specifications. Color coat materials shall exceed or equal to Laykold or Plexipave manufactures product. 7) Line for play per USA Pickleball Association (USAPA) court guidelines/specifications. 8) Install net post/nets per USA Pickleball Association (USAPA) court guidelines/specifications. 9) Contractor shall meet USA Pickleball Association (USAPA) guidelines/specifications upon completion of court surface applications and all color coat applications. Areas where court surface requires repairs, contractor will use materials per manufacture specifications to match existing conditions. Court patching to courts as required to insure displacement of water, maintain level surface not toexceed(pickleball/tennis/racquetball) tournament sport court specifications, court patch areas shall include additional color coat prior to finish color coat applications to ensure even color finish. 10) Contractor shall complete color coat applications to areas repaired to match existing color surface. 11) Contractor shall install 4' FT fence system between the pickleball courts leaving 5' space from edge of court. perimeter fence (See Fence Dimension Attachment). The 4' FT High divider fencing shall have a Yellow Corrugated Fence Cap at 4 1/2 " diameter covering the knuckle-to-knuckle fabric finish & top rail of divider fencing 12) Contractor shall complete asphalt walkway placement per owner drawing. Asphalt walkway 130'LF x 10' (approximately 1,300 SF) with ADA Accessible Ramp transition from existing asphalt to new courts on North Side. 13) Contractor shall install 70/30 mix or sod at edges of all areas disturbed by construction activities, contractor shall include fine hand grading and supplying topsoil mixture to bring soil/sod to even elevation with edge of new asphalt placement, some areas when needed may need additional materials. 14) Contractor understands and accepts that this scope of work entails installation of complete new chain-link vinyl fencing system/installation to perimeter in curb (10') as alternate per owner drawing/specifications. This installation shall consist of new components, including but not limited to fence mesh/fence fabric shall be Thermofused/Permafused II Polyolefin Coating or Spectra Poly (Vinyl Chloride) (PVC) Coated, supports, bracing, hinges, any other accessories, or the complete installation of the fence construction with new materials. Each fence post, and all support members/components (top rails, middle rails, & bottom rails) should come already powder coated black (BLACK). The Contractor shall adhere to the manufacturers' requirements and installation guidelines; Installation shall include the complete installation of fence construction with new materials. (If Applicable) Contractor's performance will be substantiated to include and provide the following: Post & Line Caps, Rail & Brace Ends, Top Rail Sleeves, Tie Wires & Hog Rings, Tension & Brace Bands, Tension Bars, Tension Wires, Truss Rod & Tightener and Any Common Chain Link Fence Fittings, etc.,. Contractor to include (4) ADA accessible gates. 15) Contractor shall provide the Chain Link Fence, associated equipment, and services as per specifications. The Chain Link Fence shall be complete with all of the necessary components as shown and described by manufacturers. Components not specifically mentioned but are necessary to furnish a complete unit ready for use shall also be included. All equipment and components that will be used shall be new and of current production of national firms that manufacture Chain Link Fencing and their specified components. 16) Contractor is responsible for the safety and security of the job site. Any vandalism, theft, etc. which occurs during the construction time is the responsibility of the Contractor. No monetary compensation shall be granted if any of the above occurs. Contractor is required to have proper insurance to cover ongoing work on the job site. If Contractor opts to hire an independent Security Company, such company is to be properly bonded and insured.
Post-Bid
Playgrounds / Parks / Athletic Fields
$246,200.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 7, 2023
April 6, 2023
7900 SW 40th St, Miami, FL
Related To This Project
Miami, FL
--
Miami, FL
Bid Date: Mar 01 2023
Miami, FL
Bid Date: Mar 07 2023
Miami, FL
Bid Date: Aug 30 2019
Miami, FL
Bid Date: Mar 30 2023
Miami, FL
--
Miami, FL
Bid Date: Mar 30 2023
Miami, FL
Bid Date: Nov 29 2023
Miami, FL
Bid Date: Mar 16 2023
Miami, FL
Bid Date: Mar 10 2023
Miami, FL
Bid Date: Mar 15 2023
Miami, FL
Bid Date: Mar 07 2023
Miami, FL
Bid Date: Feb 16 2023
Miami, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.