BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Winnipeg, Manitoba. Completed plans call for site work for a educational facility; for the construction of a 103,550-square-foot, 450-seat educational facility; and 104-seat day care center.

Louis Riel School Division (the "Owner" or LRSD) seeks to select a qualified Proponent through a procurement process to act as the Construction Manager ("CM") to provide construction management services as further described in this RFP. The project will include the construction of a new K-8 French Immersion School in the Sage Creek neighborhood in Winnipeg, Manitoba, as further described in this RFP (the "Project"). See Part 1, Section 6.0 of this RFP for further details about the Project. The CM will be engaged to provide advice to LRSD during the Pre-Construction phase of the Project and shall administer and oversee the construction work of the Project. The CM shall be 'at risk', as they will be responsible for contracting with all the Subcontractors and Suppliers and acting as a Contractor during the Construction Phase. The project will include the construction of a new K-8 French Immersion School, designed with an opening capacity for 700 students and a core capacity for 900 students. The site is located in the Sage Creek neighborhood on the southeast corner of Des Hiverants Boulevard and Warde Avenue. The school will be approximately 92,980 sq.ft. gross area including classroom spaces, a band room, home economic and industrial arts spaces. Site design and layout of the school will include an alternative design of an additional 10,995 sq. ft. (8 classrooms, circulation and ancillary space) to accommodate the full build out for 900 students. The project will also include construction of a new 74 seat child care to be designed within the main building mass. The Project's scope also includes, but is not limited to, the following specific requirements: The CM will be required to work with the entire project team to ensure that the school opens no later than January 1, 2025. It will be the responsibility of the CM to ensure that long lead items that may affect the construction schedule are ordered in advance to not slow the progress of construction. Sequential tendering will be required if the Prime Consultant and CM feel it adds value or is necessary to meet the project deadlines. The number of sequential tendering packages should be minimized to avoid confusion or gaps in tender packages. Number TEN is administering this RFP process on behalf of Louis Riel School Division. For the purposes of this procurement process, the "RFP Contact" will be: Contract Administrator: Doug Hanna, MAA, FRAIC Email: dhanna@numberten.com. All questions regarding this RFP must be directed to the RFP Contact in writing by email on or before February 24, 2023. No such communications are to be directed to anyone other than the RFP contact. Failure to adhere to this rule may result in the disqualification of the proponent and the rejection of the proponent's proposal. All questions and corresponding answers will be shared with all Vendors via Addenda to be posted on MERX. No telephone or verbal inquiries will be responded to or entertained. All inquiries must be made by email with subject line: "Questions - RFP for CM Services Ecole Sage Creek Bonavista". The total construction budget established for this 92,980 sq ft project is $42.0 million dollars. An additional construction budget of $5.0 million may be added to include an alternative design of an additional 10,995 sq ft (8 classrooms, circulation and ancillary space). Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Award

Day Care Centers

$47,000,000.00

Public - State/Provincial

LEED Certification, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
49
Bidding Soon
532
All Active Projects
231
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 7, 2023

August 30, 2023

August 13, 2025

img_map_placeholder

355 Des Hivernants Blvd, Winnipeg, MB


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.