BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Highland Park, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; playground / park / athletic field; sidewalk / parking lot; and sidewalk / parking lot.

The Park District of Highland Park is accepting sealed bids for the 2023 Asphalt Improvements Project. Questions regarding this bid should be directed to Michael Evans at 847.579.4085 or mevans@pdhp.org. Lincoln Park, 1280 Green Bay Road, Highland Park, Illinois Patch/color coat/stripe - Basketball Court Sunset Valley Golf Club, 1390 Sunset Road, Highland Park, Illinois 2" Grind/2" Overlayment of specified cart paths. This project addresses cart path sections along holes 12, 13, and 14 The Park Board of the Park District of Highland Park reserves the right to reject any or all bids in full or in part, if it shall deem it in the public interest to do so. In submitting a bid, Contractor acknowledges that Contractor must comply with all requirements of the Illinois Prevailing Wage Act and all other applicable Illinois laws. Bid Status Text Schedule: Anticipated Contract Award: 03/29/2023 Anticipated Construction Start: 04/03/2023 Anticipated Project Completion: 11/17/2023 Scope of Work The Park District of Highland Park is seeking sealed bids for the following scope of work: The bid includes Base Bid scope at: Lincoln Park (1280 Green Bay Road, Highland Park, Illinois): Patch/color coat/stripe - Basketball Court Sunset Valley Golf Club (1390 Sunset Road, Highland Park, Illinois): 2" Grind/2" Overlayment of specified cart paths. This project addresses cart path sections along holes 12, 13, and 14. The bid includes five alternates: Alternate 1 - Central Park (125 Central Avenue, Highland Park, Illinois): Striping - Parking Lot Alternate 2 - Cunniff Park (2700 Trail Way, Highland Park, Illinois): Conversion of 4 tennis courts to twelve pickleball courts. This includes: o Demolition of existing net posts o Installation of new net posts and net anchor installation o Color coat/striping Alternate 3 - Cunniff Park (2700 Trail Way, Highland Park, Illinois): Conversion of 4 tennis courts to 10 pickleball courts. This includes: o Demolition of existing net posts o Installation of new net posts and net anchor installation o color coat/striping Alternate 4 - Sunset Valley Golf Cub (1390 Sunset Road, Highland Park, Illinois): 2" Grind/2" Overlayment - Cart Path (Hole 1) Alternate 5 - Sunset Valley Golf Club (1390 Sunset Road, Highland Park, Illinois): 2" Grind/2" Overlayment - Cart Paths (Hole 10) Alternate 6 - Sunset Valley Golf Club (1390 Sunset Road, Highland Park, Illinois): 2" Grind/2" Overlayment - Cart Paths (Hole 11) Alternate 7 - Sunset Valley Golf Club (1390 Sunset Road, Highland Park, Illinois): Striping - Parking Lot (East) Alternate 8 - Sunset Valley Golf Club (1390 Sunset Road, Highland Park, Illinois): Striping - Parking Lot (South) General Note: All access to Sunset Valley Golf Club project site locations shall be on existing cart paths only. No traffic allowed on any turf areas at any time. The scope of work includes all necessary workmanship to satisfactorily complete the work as required by the contract documents. Work will start April 3, 2023 and conclude by October 27, 2023. Refer to site schedule for construction schedule. Contractors bidding on the project must have a minimum of 5 years of experience in the work or similar. NON-MANDATORY There is no pre-bid meeting.

Award

Roads / Highways

$111,721.00

Public - City

Paving, Site Work

17

5

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
390
Active Projects
190
Bidding Soon
3,756
All Active Projects
1,527
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 2, 2023

April 3, 2023

November 17, 2023

img_map_placeholder

Multiple Locations, Highland Park, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.