Site work and paving for a mixed-use development in Christiansburg, Virginia. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of November 21, 2024, per owner, several firms have been selected. Projects are ongoing. They are all in design phase, no construction timeline. Professional Services for Roanoke Street/ Depot Street Pedestrian Accommodations (UPC 122102), Roanoke Street/1st Street Pedestrian Accommodations (UPC 122103), North Franklin Sidewalk In-Fill (UPC 122104), & Roanoke Street Crossing and Sidewalk (UPC 122105) The Town of Christiansburg is seeking expressions of interest from consulting engineering firms who wish to be considered to provide professional engineering services for: Roanoke Street / Depot Street Pedestrian Accommodations: This project includes the installation of pedestrian activated crosswalk signals and curb ramps for the crossing of Depot Street at Roanoke Street. Sidewalk will also be extended along the north side of Roanoke Street from Depot Street to the existing sidewalk on the adjacent property to the east. Roanoke Street / 1st Street Pedestrian Accommodations: This project includes the installation of pedestrian activated crosswalk signals and the addition/modification of six curb ramps to meet ADA standards for the crossing of Roanoke Street and 1st Street. North Franklin Sidewalk In-Fill: This project includes the installation of sidewalk and curb & gutter along N. Franklin Street from Mill Lane to Water Street to provide pedestrians access to shopping, the aquatic center, residential areas, and the downtown area. The existing island at Mill Lane will be expanded to allow for a crosswalk with accessible curb ramps to be installed. The existing guardrail south of Mill Lane will be removed and replaced. Roanoke Street Crossing and Sidewalk: This project includes the installation of pedestrian activated crosswalk signals and curb ramps for the crossing of Roanoke Street at Depot Street. Sidewalk will also be extended along the south side of Roanoke Street to connect to the existing sidewalk at Barkwood Street to the east The method of Contractor Selection has not been Determined at this time

Design

Roads / Highways

$100,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
192
Active Projects
70
Bidding Soon
951
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2025

Project location map

Multiple Locations, Christiansburg, VA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.