Site work and new construction of a civil project in Exmore, Virginia. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

**As of april 5, 2023 , this project has been awarded to KevCor for $18,452,370.** A new low pressure wastewater collection system shall be provided for the Town of Exmore. This includes the installation of approximately 717 grinder pump stations and associated sewer lateral piping, as well as the installation of approximately 83,000 linear feet of new force main piping ranging in size from 1.25" to 8". The collection system shall discharge into the influent manhole of the pump station by others. The force mains will ultimately discharge into the HRSD owned Caroline Ave Pumping Station. The project also consists of abandoning and disposing of the Town's existing WWTP The Project includes the following Work: A new low pressure wastewater collection system shall be provided for the Town of Exmore. This includes the installation of approximately 717 grinder pump stations and associated sewer lateral piping, as well as the installation of approximately 83,000 linear feet of new force main piping ranging in size from 1.25" to 8". The collection system shall discharge into the influent manhole of the pump station by others. The force mains will ultimately discharge into the HRSD owned Caroline Ave Pumping Station. The project also consists of abandoning and disposing of the Town's existing WWTP. Bids are requested for the following Contract: Town of Exmore Sewer Collection System. The Project has an expected duration of 570 days to Final Completion. Davis-Bacon Act Bidder must be aware of and comply with all Davis-Bacon Act requirements that apply to this project. Bidders must comply with the President's Executive Order #11246, prohibiting discrimination in employment regarding race, color, creed, sex, or national origin, and Executive Orders #12138 and #11625 regarding utilization of MBE/WBE firms. Bidders shall take affirmative steps in compliance with regulations, prior to submission of bids or closing data for receipt of initial offerings, to encourage participation in projects by MBE and WBE firms. Such efforts are outlined in the Contract inserts. Bidder must demonstrate compliance with MBE/WBE requirements to be deemed responsible. Demonstration of compliance is required. Successful bidders should take reasonable affirmative steps to subcontract with MBE and WBE firms whenever additional subcontracting opportunities arise during the performance of the contract.

Award

Water / Sewer

$18,452,370.00

Public - City

New Construction, Site Work

122

15

20

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
70
Bidding Soon
825
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2023

May 22, 2023

Project location map

Multiple Locations, Exmore, VA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.