BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 19, 2024 at 8:00 PM

Updated April 20, 2024

Site work for an educational facility in Greenville, North Carolina. Completed plans call for site work for a educational facility.

Project includes the replacement of approximately 75 LF of 4 inch HPS and 2 inch PC located in box conduit from the main steam tunnel located under Beckwith drive to the Whichard building crawl space, a new cast in place concrete steam vault, approximately 200 LF of 4 inch PC replacement in the walkable tunnel located under Beckwith Drive. Also included are site improvements that consist of the replacement of approximately 500 LF of 8" gravity sanitary sewer along Beckwith, and Beckwith Drive road restoration. The state reserves the unqualified right to reject any and all proposals. Each proposal shall be accompanied by a cash deposit or a certified check drawn on some bank or trust company, insured by the Federal Deposit Insurance Corporation, of an amount equal to not less than five percent (5%) of the proposal, or in lieu thereof a bidder may offer a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina to execute the contract in accordance with the bid bond. A performance bond and a payment bond will be required for one hundred percent (100%) of the contract price. The owner reserves the right to reject any or all bids and to waive informalities. East Carolina University has an affirmative policy of fostering, promoting and conducting business with minority owned enterprises. Minority contractors are encouraged to participate in the bidding process , is a request from the Contractor seeking an interpretation or clarification by the Designer relative to the contract documents. The RFI, which shall be labeled (RFI), shall clearly and concisely set forth the issue or item requiring clarification or interpretation and why the response is needed. The RFI must set forth the Contractor's interpretation or understanding of the contract documents requirements in question, along with reasons for such an understanding.

Post-Bid

Educational

$1,300,000.00

Public - State/Provincial

Site Work

50

23

17

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
78
Bidding Soon
912
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2024

May 6, 2024

Project location map

E 5th St, Greenville, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.