BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Apple Valley, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

necessary for the following: City Project 2023-101, 2023 Street and Utility Improvements 75 EA Clear and Grub Tree 2,700 LF Remove Sanitary Sewer 2,900 LF Remove Watermain 1,200 LF Remove Storm Sewer 5,560 LF Remove Curb and Gutter 13650 SF Remove Concrete Walk, Driveway, and Valley Gutter 9,100 SY Remove Bituminous Street, Driveway, and Trail Pavement 18 EA Sanitary Sewer Structure 2,660 LF PVC Sanitary Sewer 43 EA Sanitary Sewer Service 2,950 LF DIP Watermain 45 EA Water Service 24 EA Storm Sewer Structure 2,050 LF RCP Storm Sewer 9,000 CY Common Excavation 8,900 TN Select Granular Borrow 5,950 TN Cl 5 Aggregate Base 2,300 TN Bituminous Mixture 5,560 LF Concrete Curb and Gutter 15,250 SF Concrete Walk and Driveway 11,400 SY Sod 68 EA 2" Diameter Tree With related items The bid bonds must be payable to the City of Apple Valley in the amount of five percent (5%) of the amount of bid, to be forfeited as liquidated damages in the event that the bid is accepted and the bidder shall fail to promptly enter into a written contract and furnish the required bond. Any, and all questions bidders may have in connection with this solicitation are to be directed by email only to: Aleksandr.Kabakov@bolton-menk.com Direct inquiries to Project Engineer, Alex Kabakov, at 651-955-1410. No bidder questions will be addressed after 10:00 am on Friday, March 3, 2023. Bid Security in the amount of 5 percent of the amount of the Bid must submitted through Surety 2000 and accompany each Bid in accordance with the Instructions to Bidders. The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 60 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 30 days after the date and time set for the Opening of Bids. The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract to the best interests of the Owner.

Award

Roads / Highways

$2,845,486.00

Public - City

Paving, Site Work

70

18

4

4

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
85
Bidding Soon
779
All Active Projects
326
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2023

May 8, 2023

img_map_placeholder

Multiple Locations, Apple Valley, MN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.