BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 3, 2025 at 7:00 PM

Updated January 4, 2025

Renovation of a water / sewer project in Spokane, Washington. Conceptual plans call for the renovation of a water / sewer project.

Update: https://static.spokanecity.org/documents/budget/2025/adopted-2025-2030-citywide-capital-improvement-program.pdf When Silo Digester No. 3 was constructed, the exterior cladding was removed from the project and deferred to a date in the future. Once the mixing system for this digester is constructed as part of a separate project in the Capital Improvement Plan, the exterior cladding will be installed as originally planned. Project is included in City of Spokane Fiscal Year 2025-2030 Page no.441 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- UPDATE: https://static.spokanecity.org/documents/budget/2024/adopted-2024-2029-citywide-capital-improvement-program.pdf When Silo Digester No. 3 was constructed, the exterior cladding was removed from the project and deferred to a date in the future. Once the mixing system for this digester is constructed as part of a separate project in the Capital Improvement Plan (CIP), the exterior cladding will be installed as originally planned. Project is in City of Spokane capital budget fy 2024-2029 CIP 499 _____________________________________________________________________________________________________________________________________________________________ When Silo Digester No. 3 was constructed, the exterior cladding was removed from the project and deferred to a date in the future. Once the mixing system for this digester is constructed as part of a separate project in the Capital Improvement Plan (CIP), the exterior cladding will be installed as originally planned.Exterior cladding on the silo digester will help insulate the digester, increasing operational efficiency. The exterior cladding will also match the aesthetic master plan guidelines for the entire treatment plant. This project is in included in the City's or County's FY 2023-2028 Capital Improvement Plan (CIP). As of February 13, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$2,750,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
1
Bidding Soon
143
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2026

Project location map

To Be Determined, Spokane, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.