Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 10, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a playground / park / athletic field in Cabot, Arkansas. Completed plans call for site work for a playground / park / athletic field.

Construction of: Richie Road Splash Pad Installation Completion- 60 consecutive calendar days o Install concrete pad, water features, water treatment system, and site furnishings. o Water features on-site. o Install concrete splash pad (as shown below). Approximately SF 2,930 +/-, (4" thick) concrete (non-colored, medium broom finish) with thickened edge (12") around perimeter. o Surveyor to layout splash pad with offsets (corners and radius points), and benchmarks to set grade from within 10' of splash pad. o Installation of gravel - #57 (6" deep), fine grading of gravel (2" deep). o Compaction Test must be performed. o Provide forming material for pad and installation of #4 Rebar 12" OC/EW throughout concrete o Installation of saw cuts (10'x10') and (2) two expansion joints with hydrophobic waterstop in coordination of the water features and drain collectors for wet deck. o (1) One continuous expansion joint around perimeter of wet deck to dry deck. Expansion joints constructed with #4 dowel pins 12" OC / 2 FT long, thicken edge (8"). o Excavation of area for 2,400-gallan tank. Installation of necessary gravel for tank. o Installation of 2,400 gallon concrete tank with auto water fill. 3 x 3 hatch o Installation Vortex water features (as shown and called out below) and mechanical equipment associated with water features - o Installation of (1) feature pump, (1) filter pump with 36" sand filter, (1) pool controller for pH and ORP/Chorine monitoring and adjustment, (2) peristaltic pump for acid and chlorine additions, necessary flow meters, piping and valves - o PVC (Sch. 40) piping, fittings, and valves for water features (as needed) to and from mechanical building and tank - o Arkansas Department of Health Swimming Pool Review plan review and fee. Coordinate with local Environmental Specialist for inspections in accordance with Arkansas Swimming Pool Regulations. o Provide electrical terminations of power from panel box to pump and controllers forsplash pad equipment. o Provide bonding to splash pad reinforcing, pumps, controllers, and associated equipment for the splash pad. o Provide and install chemicals to start up system and balance (one time), start-up and training of staff (one time). Additional Information: o 5 professional references for Splash Pad Installation o 141 GPM o 1 year warranty provided on the entire project.

Award

Playgrounds / Parks / Athletic Fields

$227,770.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
40
Bidding Soon
472
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2023

March 31, 2023

Project location map

502 Richie Rd, Cabot, AR

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed