BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Flagstaff, Arizona. Completed plans call for site work for a water / sewer project.

Project Type Bid Response Types Line Items Response File General Attachment (required) Type of Award Lump Sum Pre-Bid Meeting No Online Q&A No Contractor shall furnish any and all labor, materials, equipment, transportation, utilities, services and facilities for the Switzer Canyon Transmission Main Phase IV Project (Project). The Project scope is specific to the attached Special Provisions (Exhibit A). Contractor shall construct the Project for the Owner in a good, workmanlike and substantial manner and to the satisfaction of the Owner through its engineers and under the direction and supervision of the City Engineer, or his properly authorized agents including but not limited to project managers and project engineers. Contractor's work shall be strictly pursuant to and in conformity with the Contract. General Attachments required. Exhibit C - 7 Bid Schedule needs to be fully filled out and included in the General Attachments. Thank you. The Switzer Canyon Water Transmission Main Phase IV project will be to install a new City of Flagstaff 16-inch diameter high pressure water main and new 24-inch diameter medium pressure water main from Fir Avenue & San Francisco Street along San Francisco Street, Chickadee Trail and adjacent to Quintana Drive. Phase IV will stub-out both the new 16-inch and 24-inch mains north of Quintana Drive for future Phase V connection and extension. The Project generally consists of installing two new water transmission mains, 16" and 24", that will complete the distribution system, zone A and B, from near the intersection of Fir Avenue and San Francisco Street to North Quintana Drive. The length of Phase IV is approximately 5200 feet. The Project area extends outside City of Flagstaff limits. Included in the Project will be the two (2) water mains with numerous gate valves, fire hydrants and other appurtenances. Work will also include returning disturbed areas to their original condition per Restoration Guidelines in the Special Provisions. Approximately 800 feet of gas main relocation with trenching, bedding and backfilling is included in this project. Approximately 500 feet of social trail will be relocated as well Written requests may be submitted via e-mail to Emily Markel, Acting Purchasing Manager at emarkel@flagstaffaz.gov. Requests for clarifications/questions must be received no later than 3:00 P.M. March 10, 2023.

Bid Results

Water / Sewer

$5,291,814.00

Public - City

Site Work

38

8

4

4

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
6
Bidding Soon
115
All Active Projects
52
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 10, 2023

April 3, 2023

img_map_placeholder

N Switzer Canyon Dr, Flagstaff, AZ

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.