BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Flagstaff, Arizona. Completed plans call for site work for a water / sewer project.

Scope of Work. Contractor shall furnish any and all labor, materials, equipment, transportation, utilities, services and facilities for the Soliere Avenue Water Transmission Main Project ("Project"). The Project scope is specific to the attached Special Provisions ("Exhibit A"). Contractor shall construct the Project for the Owner in a good, workmanlike and substantial manner and to the satisfaction of the Owner through its engineers and under the direction and supervision of the City Engineer, or his properly authorized agents including but not limited to project managers and project engineers. Contractor's work shall be strictly pursuant to and in conformity with the Contract. General Attachments required. Exhibit C - 7 Bid Schedule needs to be fully filled out and included in the General Attachments Project Type Bid Response Types Line Items General Attachment (required) Type of Award Lump Sum Pre-Bid Meeting No Online Q&A No The Project will involve a full plant shutdown to construct new static mixer vault and provide new static mixer in the raw water piping, remove and replace basin isolation valves, abandon basin tie valves and piping, repair channel trough and remove and replace MCC buckets. The Project will also require a partial plant shutdown in order to demo major mechanical equipment and structural supports and modifications, and provide basin floor sloping, install mechanical equipment, coat channel trough, and provide channel trough covers, and electrical modifications for one basin (Project). This summary is not a comprehensive account of the Project. The plan sets and specifications attached hereto shall be considered a comprehensive detail of the work to be performed . Written requests may be submitted via e-mail to Emily Markel, Acting Purchasing Manager at emarkel@flagstaffaz.gov. Requests for clarifications/questions must be received no later than 3:00 P.M. March 10, 2023.

Bid Results

Water / Sewer

$2,900,913.00

Public - City

Site Work

15

9

2

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
2
Bidding Soon
71
All Active Projects
18
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2023

April 3, 2023

img_map_placeholder

Soliere Ave, Flagstaff, AZ


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.