Site work for a water / sewer project in Sarasota, Florida. Completed plans call for site work for a water / sewer project.

Sarasota County ("County"), a political subdivision of the State of Florida, will receive proposals on the date indicated in Periscope S2G for the purpose of selecting a qualified Proposer to provide, install, and startup turn-key automated residual control system(s) (system) on the County's potable water storage tank(s). Contract Award 07/12/2023 mneel@scgov.net The County operates a variety of potable water storage tanks that vary from ground storage tanks to elevated storage tanks. The potable water tanks are where the future potable water is continuously mixed, disinfected, and sampled. Due to a change in system hydraulics and advances in the water treatment industry, Sarasota County is now seeking proposals for an automated residual control system to be installed to efficiently and effectively monitor, mix, and dose water treatment chemicals to maintain water quality in the County's potable water tank(s). The mixing system shall be installed with automated liquid sodium hypochlorite and liquid ammonium sulfate feeds to provide optimum water quality while allowing water treatment plant operators the ability to set, control, and maintain residual levels in a safe and cost-effective way. a. Equipment must have the ability to provide real-time sampling and analysis b. System must have remote monitoring possibility and log data c. System must be housed in a structure meant to withstand outdoor conditions at the installation location. 1. Chemicals will be stored in a separate area. 2. All structures are to be 150 mile per hour rated. The volume of water that moves through or is stored at these facilities is dependent of location and time of year. A. North Elevated Tower (2.0 MG): 1850 Wendell Kent Rd., Sarasota, FL 34240 i. This site is typically turned over once a day. ii. The average flow (in or out of the tank) is between 1,000-1,500 gallons per minute (gpm). iii. The peak hourly rate of flow is 3,000 gpm. The max flow only reaches that rate for a very short period of time. This occurs once or twice a day at most. iv. For future projected flow rates, refer to the North Elevated Tower 2023 Flow Projections graph in Attachment 1 - Flow Rates. B. Carlton Water Treatment Plant (one [1] tank @ 5.0 MG; 5.0 MG total): 1255 Mabry Carlton Pkwy., Venice, FL 34292 i. Existing chemical storage tanks and chemical housing structures are onsite and shall be used for this project, if needed. a. Ammonium sulfate: one (1) 6,150-gallon tank b. Sodium hypochlorite: six (6) 4,100-gallon tanks C. Venice Gardens Water Treatment Plant (two [2] tanks @ 2.0 MG, one [1] tank @ 1.0 MG; 5.0 MG total): 1350 Jacaranda Blvd., Venice, FL 34293 i. Existing chemical storage tanks and chemical housing structures are onsite and shall be used for this project, if needed. a. Ammonium sulfate: two (2) 800-gallon tanks b. Sodium hypochlorite: two (2) 800-gallon tanks D. Pump Station #1 (3.0 MG): 3120 University Parkway, Sarasota, FL 34243 i. Existing chemical storage tanks and chemical housing structures are onsite and shall be used for this project, if needed. a. Ammonium sulfate: three (3) 330-gallon tanks, one (1) 200- gallon tank b. Sodium hypochlorite: one (1) 4,100-gallon tank E. Pump Station #2 (1.0 MG): 1001 S. Beneva Rd., Sarasota, FL 34232 F. Pump Station #3 (three [3] tanks @ 1.5 MG; 4.5 MG total): 5508 Ruby Ln., Sarasota, FL 34231 i. Existing chemical storage tanks and chemical housing structures are onsite and shall be used for this project, if needed. a. Ammonium sulfate: one (1) 330-gallon tank b. Sodium hypochlorite: one (1) 550-gallon tank, one (1) 1,050- gallon tank G. Pump Station #5 (2.5 MG): 5949 Proctor Rd., Sarasota, FL 34233 i. Existing chemical storage tanks and chemical housing structures are onsite and shall be used for this project, if needed. a. Ammonium sulfate: one (1) 330-gallon tank b. Sodium hypochlorite: one (1) 850-gallon tank H. Pump Station #6 (3.0 MG): 4201 Vamo Way, Sarasota, FL 34238 I. Elevated Tower Gulfgate (0.25 MG): 2602 Mall Dr., Sarasota, FL 34231

Post-Bid

Water / Sewer

$1,300,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
45
Bidding Soon
877
All Active Projects
343
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2023

May 16, 2023

img_map_placeholder

Multiple Locations, Sarasota, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.