BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 26, 2023 at 8:00 PM

Updated December 7, 2024

Site work and new construction of a municipal facility in North Charleston, South Carolina. Completed plans call for the construction of a 7,072-square-foot municipal facility; and for site work for a municipal facility.

As of March 24, 2023, the project has been awarded and notice to proceed was issued April 10, 2023, however, an exact timeline for construction has not been confirmed. Bid documents for the "Navy Base Intermodal Facility Buildings" project in North Charleston, South Carolina, will be available for distribution to qualified bidders by the South Carolina Ports Authority (SCPA) The project involves constructing an approximate 6,240-SF Administration Building, 832-SF Driver Assistance Building, and four canopy structures All temporary and permanent utility outages, disconnections, and connections shall be closely coordinated with the Owner, Engineer, and Utility Owner. The Contractor shall submit a written request for utility outages and support to facilitate utility connection or disconnection to the Owner, Engineer, and Utility Owner at least seven (7) calendar days in advance of the requested outage, connection, or disconnection date. The request shall include, but not be limited to the following: The location, exact scope of work, impact, time and date of the outage, connection, or disconnection. The contractor shall confirm that all materials and labor are available and that all preparatory work has been completed prior to start of the work. Every effort shall be made to minimize the duration and impacts of outages. In addition, every effort shall be made to schedule power outages during off-peak periods (generally nights and/or weekends). Upon completion of a utility outage, the utility service shall be put back in service and must be fully operational and without defect. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Municipal

$6,535,082.00

Public - State/Provincial

New Construction, Site Work

140

31

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
50
Bidding Soon
774
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2023

May 9, 2023

Project location map

2025 Bainbridge Ave, North Charleston, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.