EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 10, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Palatine, Illinois. Completed plans call for the renovation of a educational facility.

Work includes (but is not limited to) the following: Minor demolition for remodeling, Sealant work, Firestopping work, Drywall work, Raised flooring modifications, removal & reinstallation, Suspended ceiling systems removal and reinstallation, Painting work, Plumbing work, Mechanical work, and Electrical work. All questions regarding the Bidding Documents shall be submitted to the Architect via email and / or fax to both Jewell Jackson (purchasing@harpercollege.edu) and Scott Steingraeber (ssteingraeber@legat.com). Replies will be issued to all bidders of record in the form of an Addendum. Question Deadline 02/25/2023 at 12:00 PM CT All questions regarding the Bidding Documents shall be submitted to the Architect via email and / or fax to both Jewell Jackson (ourchasinq@harpercolleae.edu) and Scott Steingraeber (ssteingraeber@legat.com). Replies will be issued to all bidders of record in the form of an Addendum. Bid security in the form of bid bond in an amount equal to 10 percent (10%) of the aggregate of the Base Bid amount and all Alternate Bid amounts shall be submitted with the bid. Performance, Labor and Material Payment Bonds, and Certificate of Insurance will be required from the successful bidder. No bid may be withdrawn for a period of ninety days after the submission without the consent of the Board of Trustees. Any bid submitted unsealed, unsigned, fax transmission, e-mail, or received subsequent to the aforementioned date and time, may be disqualified and returned to the bidder. Harper College reserves the right to reject any or all bids or parts thereof, to waive any irregularities or informalities in bidding procedures, and to award the contract in a manner best serving the interest of the College. All bidders must comply with applicable Illinois Law requiring the payment of prevailing wages by all Contractors working on public works. Bidder must comply with the Illinois Statutory requirements regarding labor, including Equal Employment Opportunity Laws. Contractors shall pay not less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Wages of Employees on Public Works Act (820 ILCS 130/1-12). Bidders shall comply with Business Enterprise Program: Participation and Utilization Plan developed by Harper College. There is a 30 percent aspirational goal on the contract.

Award

Educational

$393,000.00

Public - County

Renovation

13

15

2

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Preformed Joint Seals, Backer Rods
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Interior Specialties, Partitions
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Excavation and Fill, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors

Find More Local Projects

Within 75 Miles of This Project
279
Active Projects
178
Bidding Soon
2,683
All Active Projects
1,210
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2023

April 10, 2023

img_map_placeholder

1200 W Algonquin Rd, Palatine, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Y211 Cooling System Upgrades Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.