Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 28, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Benton, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of April 28, 2023, project was awarded to VSS INTERNATIONAL, INC., but awarded amount is not available. Questions about alleged patent ambiguity of the plans, specifications, or estimate must be asked before bid opening. After bid opening, the Department does not consider these questions as bid protests. If work activities obliterate pavement delineation, place temporary or permanent pavement delineation before opening the traveled way to traffic. The temporary pavement delineation must consist of limit line, crosswalk, lane line, edge line, and centerline pavement delineation for traveled ways open to traffic. Temporary pavement delineation must match final stripe location. The color and dimension for temporary limit lines and crosswalks must match existing pavement markings being replaced. The Engineer determines the location for the temporary limit lines and crosswalks. LOCATION: 09-Mno-120, 395-55.0/59.0, 69.6/76.0 *** MONO COUNTY NEAR BENTON ON ROUTE 120 FROM 0.1 MILE WEST OF YELLOW JACKET ROAD TO ROUTE 6 AND NEAR BRIDGEPORT ON ROUTE 395 FROM 0.1 MILE NORTH OF ROUTE 270 TO 0.2 MILE NORTH OF JACK SAWYER ROAD ESTIMATED AMOUNT $1,570,000 WORKING DAYS: 25

Award

Roads / Highways

$1,570,000.00

Public - County

Paving, Site Work

43

14

12

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2023

September 11, 2023

Project location map

Multiple Locations, Benton, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed