Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 6, 2025 at 7:00 PM
Updated November 7, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in Highland, New York. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Rehabilitation of County Bridge 100 on County Road 11/State Touring Route 55 in the Town of Highland. (3) beams spalled and two with prestressing strands exposed - concrete spalled under rusting strand. Large spall developing at upstream north wing wall & abutment joint. Beams 9 and 10 have hollow sounding areas and exposed strands. Keyway joints between beams leak. Metal grates are Red Flagged by NYSDOT due to severe deterioration. If this project were built using contract services the total cost would be estimated to be $1,000,000 in lieu of the $600,000 being budgeted for this project to be built using DPW forces. Hence it is estimated that the County will save $400,000 through construction by DPW forces. Beneficially this project will maintain the use of road to the public, school buses, utilities, commercial businesses and emergency responders As of November 6, 2025, this project is included in the FY 2026-2031 CIP. Information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Bridges / Tunnels
$600,000.00
Public - County
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2028
Co Rd 11, Highland, NY
Related To This Project
Highland, NY
--
Highland, NY
Bid Date: Nov 18 2020
Highland, NY
Bid Date: Dec 09 2020
Highland, NY
Bid Date: Nov 18 2020
Highland, NY
Bid Date: Aug 12 2021
Highland, NY
Bid Date: Dec 20 2019
Highland, NY
Bid Date: Dec 20 2019
Highland, NY
Bid Date: Dec 20 2019
Highland, NY
Bid Date: Jun 29 2022
Highland, NY
--
Highland, NY
Bid Date: Nov 18 2020
Highland, NY
--
Highland, NY
Bid Date: May 09 2022
Highland, NY
Bid Date: Apr 25 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
