This is a service / maintenance or supply contract in Apache Junction, Arizona. Contact the soliciting agency for additional information.

Project Name: Pump Station Fiber Connectivity Project (TRACS) Number: F0587 01D District: Central Route/MP: Various Locations Construction Funding FY: FY 2024 This project is to establish fiber connectivity to pump stations. By establishing the fiber connectivity to all pump stations in the Phoenix metro area a more robust Supervisory Control and Data Acquisition (SCADA) system can then be deployed to improve the department's existing pump station operations. Trenching, directional bore, conduit installation, pull box installation, 12-strand fiber installation, and termination panel installation at approximately 48 pump station/pump locations on I-10, I-17, SR202 Red mountain, SR101 Price and Agua Fria, SR51, US60, SR303, and SR24. This 12-strand fiber will be spliced into the department's existing backbone fiber either at existing splice enclosure locations or newly installed splice enclosures. All work will be performed within the department's existing ROW with the exception of the Spookhill Equipment UP (202 Red Mountain @ Brown Road). If the Spookhill work is deemed feasible for this effort it will require a permit from FCDMC. The consultant shall provide a bid package which includes plans, specifications and estimates for construction. The design consultant shall also provide necessary project management tasks including coordination, meetings, project schedule updates and comment responses. Document retention, project schedule, and risk register updates within the Workfront platform will be required. Questions, in writing, shall be received by ECS at the below email address until 3 BUSINESS DAYS BEFORE SOI DUE DATE at 2:00 P.M. (Arizona Time). Final Questions Due: February 15, 2023 at 2:00 P.M. (Arizona Time) SOI Submittal Date: February 20, 2023 at 11:00 A.M. (Arizona Time) Estimated Selection Date: March 6, 2023 The method of contractor selection has not been determined at this time. AZ DOT - RFQ - Project Development On-Call - Pump Station Fiber Connectivity

Conceptual

Water / Sewer

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
14
Bidding Soon
686
All Active Projects
248
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 21, 2023

img_map_placeholder

US-60, Apache Junction, AZ


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.