BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Fairmount, North Dakota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Online Bidding: Available Kyle Rieth, telephone: 701.282.4692, kyle.rieth@mooreengineeringinc.com, Only questions made in writing by an attachment (PDF) to email or mail may be considered for response by Addenda. Description: Bids will be received for the following prime Contracts: Contract A: Sanitary Sewer Improvements - 3rd Street from 3rd Avenue North to 2nd Avenue South: sanitary sewer improvements including sanitary sewer main and service replacements, sanitary main relining, sanitary sewer manhole rehabilitation, incidental asphalt patching, and miscellaneous construction items as shown in the Drawings and associated specification sections. Contract B: Storm and Street Improvements - Front Street from Main Avenue to 4th Avenue South: storm and street improvements including installation of storm sewer pipes and structures, sanitary sewer spot repair, replacement of curb and gutter, concrete flatwork, asphalt milling, asphalt patching and overlay, and miscellaneous construction items as shown in the Drawings and associated specification sections. Contract C: Asphalt Emulsion Seal Coat: seal coat improvements throughout the entire City of Fairmount as shown in the Drawings and associated specification sections. Additional Description: Contract A : $420,000.00 Contract B: $510,000.00 Alternate B1: $10,000.00 Contract C: $265,000.00 Bid Result Contract A - Sanitary Sewer Improvements on 3rd Street from 3rd Avenue North to 2nd Avenue South - Crow River Construction - $495,225.00 Contract B - Storm and Street Improvements on Front Street South from Main Avenue to 4th Avenue South - Crow River Construction - $630,839.50 Alternate B1 - Perforated Pipe - Crow River Construction - $3,490.00 Contract C - Asphalt Emulsion Seal Coat - Crow River Construction - $325,000.00

Bid Results

Water / Sewer

$1,454,555.00

Public - City

Paving, Site Work

48

13

6

7

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
13
Bidding Soon
108
All Active Projects
47
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2023

May 8, 2023

img_map_placeholder

Multiple Locations, Fairmount, ND


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.