Site work and paving for a road / highway in Hartford, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The City of Hartford has been awarded federal funding through the WisDOT Surface Transportation Program (STP) - West Bend Urbanized Area, which is 80% (federal)-20% (local), for the design an approximately 1.3 mile mill and overlay of Independence Av. in the DodgeIndustrial Park. The project would include the addition of street lighting between Liberty Av. and the Rubicon River bridge (B 66 714 95), curb & gutter repair/replacement and other related work. The purpose of this document is to provide interested parties with information to enable them to prepare and submit proposals for the design and preparation of preliminary and final engineering plans, specifications and estimates for the 2705-06-00/70 mill and overlay of Independence Ave, STH 60-W State St. Design is scheduled for FY 2023 a signed contract must be encumbered before June 30, 2023. Construction is scheduled for 3/11/2025, PSE is 11/1/2024. For further information regarding this RFP, contact: John Griffin, PE City Engineer @ jgriffin@hartford.wi.gov The proposed improvements will include: o Pavement evaluation and design for milling and overlay. o Removal and replacement of various sections of curb and gutter where needed. o Addition of street lighting from Liberty Av. north to the Rubicon River bridge (B 66 714 95) o Evaluation of bridge approach drainage and possible removal of curb and gutter and introduction of concrete flumes to improve drainage away from the structure B 66 714 95. o Other related work A summary of the services required include: o Topographic Survey o Preliminary Plans o Preliminary Estimates o Design Reports o Environmental Document o Utility Status Report o Archeological/Historical Coordination and/or Survey o Public Involvement o Agency Coordination and Permits o Utility Coordination o Hazardous Material Investigation (Phase 1) o Meetings o Railroad Coordination o Draft PS&E o Final Structure Plans o Final PS&E
Post-Bid
Roads / Highways
$700,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 2, 2023
April 3, 2023
Independence Ave, Hartford, WI
Related To This Project
Hartford, WI
Bid Date: Mar 02 2023
Hartford, WI
--
Hartford, WI
--
Hartford, WI
Bid Date: Feb 21 2023
Hartford, WI
--
Hartford, WI
--
Hartford, WI
Bid Date: Apr 16 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.