BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Hartford, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The City of Hartford has been awarded federal funding through the WisDOT Surface Transportation Program (STP) - West Bend Urbanized Area, which is 80% (federal)-20% (local), for the design an approximately 1.3 mile mill and overlay of Independence Av. in the DodgeIndustrial Park. The project would include the addition of street lighting between Liberty Av. and the Rubicon River bridge (B 66 714 95), curb & gutter repair/replacement and other related work. The purpose of this document is to provide interested parties with information to enable them to prepare and submit proposals for the design and preparation of preliminary and final engineering plans, specifications and estimates for the 2705-06-00/70 mill and overlay of Independence Ave, STH 60-W State St. Design is scheduled for FY 2023 a signed contract must be encumbered before June 30, 2023. Construction is scheduled for 3/11/2025, PSE is 11/1/2024. For further information regarding this RFP, contact: John Griffin, PE City Engineer @ jgriffin@hartford.wi.gov The proposed improvements will include: o Pavement evaluation and design for milling and overlay. o Removal and replacement of various sections of curb and gutter where needed. o Addition of street lighting from Liberty Av. north to the Rubicon River bridge (B 66 714 95) o Evaluation of bridge approach drainage and possible removal of curb and gutter and introduction of concrete flumes to improve drainage away from the structure B 66 714 95. o Other related work A summary of the services required include: o Topographic Survey o Preliminary Plans o Preliminary Estimates o Design Reports o Environmental Document o Utility Status Report o Archeological/Historical Coordination and/or Survey o Public Involvement o Agency Coordination and Permits o Utility Coordination o Hazardous Material Investigation (Phase 1) o Meetings o Railroad Coordination o Draft PS&E o Final Structure Plans o Final PS&E

Post-Bid

Roads / Highways

$700,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
54
Bidding Soon
966
All Active Projects
422
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2023

April 3, 2023

img_map_placeholder

Independence Ave, Hartford, WI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.