BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Modesto, California. Contact the soliciting agency for additional information.

Introduction: The Public Works Department, Airport Division seeks to obtain a 2-year contract for painting services. This contract would have the possibility of two 1-year extensions. Contractor Responsibilities: Contractor is to provide the labor, needed materials and equipment for any painting project located on Airport property. Contractor is to adhere to all Airport safety protocols as well as follow all federal, state and local guidelines. City Responsibilities: The Airport will coordinate with their tenants to cover and/or remove any personal belongings, cars, aircraft etc. The Airport will provide access to the airfield as well as detailed instruction for path of travel to and from the specific jobsite. Typical Type of Projects: Painting of Airport facilities, primarily aircraft storage hangars. Aircraft storage hangars are galvanized steel siding with metal framing. These structures will require initial cleaning, rust treatment, priming and multiple coats of paint. There could potentially be other standard building type projects, if funds are available. Schedule: The contractor is to coordinate the project schedule with the Airport Manager. Contractor must give a minimum of two weeks' advanced notice prior to start of project for the Airport to coordinate with their tenants. Any changes to the schedule once the project has begun, must be coordinated, and approved through the Airport Manager. When the project begins the contractor is to remain onsite until the completion of the project unless arrangements have been made and approval is granted by the Airport Manager. Project Completion Criteria: All project materials, masking and debris must be removed by the contractor. Job must be walked with the Airport Manager and Project Foreman for final inspection prior to acceptance of project completion. Additional Terms and Conditions: Rust treatment must be guaranteed for a minimum of 1 year. If rust returns within this timeframe, the contractor, at their expense, must retreat the rusted areas, prime and paint. Pre-Bid Meeting Yes - Mandatory Pre-Bid Meeting Date 02/27/2023 9:01 AM (PST) Pre-Bid Meeting Location Modesto Airport 700 Tioga Drive, Gate #2 Modesto, CA 95354

Post-Bid

Transportation Terminals

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
87
Bidding Soon
1,711
All Active Projects
725
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2023

April 21, 2023

img_map_placeholder

To Be Determined, Modesto, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.