EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 13, 2023 at 8:00 PM

Updated October 1, 2024

Remodeling and renovation of an educational facility in Middletown, Pennsylvania. Completed plans call for the remodel of a educational facility.

*Poole Anderson Construction was not awarded. The renovation to 16 bathroom at Penn State Harrisburg campus at the Mahoney House. There is also Alternates for renovation to bathroom/toilet rooms at Pine House. Last Date for Questions : Friday, February 17, 2023 @12:00 PM, Prevailing Time Questions should be submitted via the e-Builder Project Bid Portal Prevailing wage DO APPLY Major items include shower replacement, sink and counter replacement, drywall patching and painting, lighting, resinous flooring, and fixtures as specified. Alternates as follows: 1. Add 4 Toilet Rooms - Pine House 101, 102 2. Add 4 Toilet Rooms - Pine House 103, 104 3. Add 4 Toilet Rooms - Pine House 201, 202 4. Add 4 Toilet Rooms - Pine House 203, 204 Unit Pricing as follows: 1. Add Toilet Seat per each. 2. Add Toilet Flange per each. 3. Add Toilet flushing repair - fluidmaster per each 4. Square Foot of drywall demo and replace 5. Add ADA Toilet per each *Addendum #1 has been uploaded. *Addendum #2 has been uploaded.

Post-Bid

Educational

$480,000.00

Public - State/Provincial

Remodeling, Renovation

7

11

6

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Examination and Preparation, Execution, Cleaning and Waste Management
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Flooring, Fluid-Applied Flooring, Resinous Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Compartments and Cubicles
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Fixtures
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
112
Bidding Soon
1,638
All Active Projects
724
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2023

May 10, 2023

img_map_placeholder

777 W Harrisburg Pike, Middletown, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

PSU - Harrisburg Capital Village Apartment Bathroom Renovation - Phase 3

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.