BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a civil project in Freeburg, Illinois. Conceptual plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; for outdoor lighting for a road / highway; and water / sewer project.

Job No. D-98-102-20, FAU Rte. 9153 (IL Route 3 Connector), Phase II Project, St. Clair County, Region Five/District Eight. This project may contain Federal Funds. This project requires 21% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.07. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on May 3, 2023, at 10:00 AM at the Region Five/District Eight Office in Collinsville. Phase II engineering services required for this project include the preparation of all Plans, Specifications and Estimates (PS&E documents) for this project for the construction of a 1.6-milelong new arterial connection between relocated Illinois Route 3 and Illinois Route 203 in Madison and St. Clair Counties. Included in this contract is the preparation roadway and structure plans, maintenance of traffic plans, retaining wall plans, drainage plans, detention basins, storm water pollution prevention plan, erosion control plans, pavement designs, roadway lighting plans and traffic signal plans. Phase II work may also include, but are not limited to, public involvement, geotechnical boings/cores and analysis, roadway geotechnical reports, structure geotechnical reports, detailed traffic management plans and all other necessary related work to complete Phase II. The Consultant shall provide a new topo survey. The department will furnish the Consultant with any existing structure and roadway plans, structure inspection reports, agency coordination, existing right-of-way plans, existing and projected traffic data, utility coordination, crash data, and other relevant and available information as necessary. The completion date for this contract will be 60 months after authorization to proceed. The Statements of Interest must also include: A Project Understanding and Approach, describing in detail on how the Consultant will accomplish the work, including any work that would be performed by a Subconsultant(s). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 43 - RFQ Engineering - FAU Rte. 9153 (IL Route 3 Connector), Phase II Project, St. Clair County, Region Five/District Eight

Conceptual

Roads / Highways

$2,000,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
116
Bidding Soon
1,358
All Active Projects
612
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 23, 2024

February 23, 2029

img_map_placeholder

IL Route 3 Connector, Freeburg, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.