Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and new construction of a mixed-use development in Lakewood, Washington. Completed plans call for the construction of a one-story above grade pre-engineered storage facility; for site work for a pre-engineered storage facility; for the demolition of a medical facility; 590,000-square-foot, seven-story above grade medical facility; and medical facility.
Notice of Intent for Utilization of Alternative Selection Process - Mechanical Contractor Construction Manager (MC/CM) Clark Construction Group has been selected by The Department of Enterprise Services and The Department of Social Health Services as the General Contractor/Construction Manager (GC/CM), for the Western State Hospital - New Forensic Hospital project. The Western State Hospital - New Forensic Hospital project consists of demolishing twelve existing buildings and infrastructure and replacing with approximately 590,000 SF of new development, consisting of 3 new buildings: a 4-story post tensioned concrete and structural steel hospital (HOS), a 3-story mass timber administration building (ADM), and a 1-story prefabricated steel facilities annex building. The new Forensic Hospital is required to achieve LEED silver performance under v.4 for Healthcare. In addition, the facility must comply with the Centers of Medicare and Medicaid Services requirements, and per the Washington Governor's Executive Order 20-01, the facility shall be designed to be net-zero energy. Clark Construction intends to select the Mechanical Contractor Construction Manager utilizing an alternative procurement method in accordance with the provisions of RCW 39.10.385. Per RCW 39.10.385, Clark Construction, DES, and DSHS have determined that this project meets the criteria established in RCW 39.10.385 for use of the alternative subcontractor selection process. It is in the best interest of the public to use the alternative selection process because the project will require: preconstruction services including design and engineering for new construction, technical coordination and phasing of these elements with the project stakeholders (State of Washington, Hospital and Administrative Employees, the Architect of Record and the Engineer of Record, and the GC/CM), and demonstrable experience performing specialty subcontractor construction manager roles on projects of similar size and complexity. Construction will be within an active hospital campus, which will continue to operate during construction. Additionally, the prospective Mechanical Contractor Construction Manager will require dedicated resources and the necessary working capital to staff twelve months of preconstruction efforts. Clark Construction Group is an equal opportunity employer and encourages bids from all subcontractors including minority, women, small, veteran, disadvantaged, and LGBTQ+ owned businesses.
Post-Bid
Medical
$68,630,000.00
Public - State/Provincial
Demolition, LEED Certification, New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 3, 2023
April 3, 2023
Multiple Locations, Lakewood, WA
Related To This Project
Lakewood, WA
Bid Date: Mar 08 2023
Lakewood, WA
Bid Date: Mar 08 2023
Lakewood, WA
Bid Date: Mar 15 2023
Lakewood, WA
Bid Date: Mar 28 2023
Lakewood, WA
Bid Date: Mar 15 2023
Lakewood, WA
Bid Date: Mar 21 2023
Lakewood, WA
Bid Date: Mar 21 2023
Lakewood, WA
Bid Date: Mar 30 2023
Lakewood, WA
Bid Date: Mar 01 2023
Lakewood, WA
Bid Date: Mar 13 2023
Lakewood, WA
--
Lakewood, WA
--
Lakewood, WA
Bid Date: Feb 14 2023
Lakewood, WA
Bid Date: May 05 2020
Lakewood, WA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.