EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 25, 2023 at 8:00 PM

Updated April 12, 2024

Site work and new construction of a civil project in Grand Forks, North Dakota. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Project Category Code: Lift Stations/Lift Station Equipment, Sewer Pump Station, Sewer Force Main, Water/Wastewater Infrastructure, Construction, Landscaping The scope of work generally consists of the following: General Work: Construct a new lift station including 24' diameter cast in place concrete barrel to be installed by sinking, a 28'x36' precast control building, spiral stairs and catwalks, submersible pumps, check valves and piping, roofing, painting, trees, grass restoration, and miscellaneous Work. Mechanical Work: Building ventilation systems including intake and exhaust ducts, dampers, fans, ductwork and controls, and a cabinet ventilation system including intake, filters, heater, fan controls, ductwork and miscellaneous Work. Electrical Work: New electrical service, CT cabinet, disconnects, transfer switches, distribution panel, lighting panel, supervisory control system, lighting, telemetry and miscellaneous Work. Forcemain Work: 1,400 LF of 12" PVC force main, bypass riser, force main drain down, tapping sleeve, connection to existing force main, new 12" gate valves, grass restoration, and miscellaneous Work. Bids will be lump sum price in accordance with the following schedules: Schedule A - Consists of a single prime contract for General Work, Mechanical Work, and Electrical Work combined. Schedule B - Consists of separate prime contracts for General Work, Mechanical Work, and Electrical Work for Lift Station. Bidder is not required to submit bids for each but may do so if he chooses. Bidder may submit a single bid for General Work, Mechanical Work, Electrical Work or a combination. Bidder may bid any or all schedules as he chooses. If Agreement is to be awarded, a single agreement for Schedule A or three separate Agreements for Schedule B will be awarded for the schedule resulting in the lowest total project bid. Schedule C - Is a separate schedule for the Forcemain work. All work is to be in accordance with the Bidding Documents which are on file in the office of the City Engineer, Grand Forks, North Dakota, reference to which is made for detailed description of the work. Each bid must be accompanied by a separate PDF document (uploaded to Quest VirtuBid) containing an acceptable bidder's bond in a sum equal to five percent of the full amount of the bid, executed by the bidder as principal and by a surety, conditioned that if the principal's bid be accepted and the contract awarded to the principal, the principal, within ten days after notice of award, will execute a contract in accordance with the term of the bid and a contractor's bond as required by law and the regulations and determinations of the Grand Forks City Council. Bidders on this work will be required to comply with Title 40 CFR Part 33- Participation by Disadvantaged Business Enterprises in the United States Environmental Protection Agency Programs. The requirements for bidders and contractors under this regulation concern utilization of Minority Business Enterprises (MBE), Women's Business Enterprises (WBE), and Small Business Enterprises (SBE) and are explained in the specifications. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in the specifications. Bidders on this work will be required to comply with American Iron and Steel requirements of the Consolidated Appropriations Act, 2014. The requirements for bidders and contractors under this regulation are explained in the specifications. Additional Description: The City Council reserves the right to reject any or all bids and/or to waive any informality in the bids received and to accept any bid deemed to be most favorable to the interest of the City of Grand Forks. The successful bidder shall warrant and guarantee work for two years and shall furnish performance and payment bonds, in the amount of 100% of the contract. Bonds shall remain in effect until two years after date of final payment. Within fifteen (15) days after effective date of Agreement, Contractor shall submit to Owner a written notice indicating the specific date that Contractor will begin construction. Unless extended as per Article 11 of the General Conditions, Schedule A or B, Milestone "A" (All work with the exception of grass and landscaping) shall be completed by June 30, 2024, and all work shall be completed and ready for final payment in accordance with paragraph 15.06 of the General Conditions no later than October 15, 2024; Schedule C, Milestone "A" (all work requiring forcemain shut-down) shall be completed within 3 calendar days, and all work shall be completed and ready for final payment in accordance with paragraph 15.06 of the General Conditions no later than October 31, 2023. Bid results - Option 1 SRF Compliant Schedule C - Forcemain - United Crane & Excavation - $612,100.00 Option 2 Non SRF Schedule C - Forcemain - United Crane & Excavation - $531,100.00

Bid Results

Water / Sewer

$1,143,200.00

Public - City

New Construction, Site Work

77

26

6

5

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Quality Requirements, Regulatory Requirements, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Art, Sculptures, Cast Sculpture
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Dewatering, Fill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
6
Bidding Soon
214
All Active Projects
70
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2023

April 10, 2023

img_map_placeholder

To Be Determined, Grand Forks, ND

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

LS 49 and Force Main Schedule C Forcemain

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.