Site work and new construction of a civil project in Grand Forks, North Dakota. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
Project Category Code: Lift Stations/Lift Station Equipment, Sewer Pump Station, Sewer Force Main, Water/Wastewater Infrastructure, Construction, Landscaping The scope of work generally consists of the following: General Work: Construct a new lift station including 24' diameter cast in place concrete barrel to be installed by sinking, a 28'x36' precast control building, spiral stairs and catwalks, submersible pumps, check valves and piping, roofing, painting, trees, grass restoration, and miscellaneous Work. Mechanical Work: Building ventilation systems including intake and exhaust ducts, dampers, fans, ductwork and controls, and a cabinet ventilation system including intake, filters, heater, fan controls, ductwork and miscellaneous Work. Electrical Work: New electrical service, CT cabinet, disconnects, transfer switches, distribution panel, lighting panel, supervisory control system, lighting, telemetry and miscellaneous Work. Forcemain Work: 1,400 LF of 12" PVC force main, bypass riser, force main drain down, tapping sleeve, connection to existing force main, new 12" gate valves, grass restoration, and miscellaneous Work. Bids will be lump sum price in accordance with the following schedules: Schedule A - Consists of a single prime contract for General Work, Mechanical Work, and Electrical Work combined. Schedule B - Consists of separate prime contracts for General Work, Mechanical Work, and Electrical Work for Lift Station. Bidder is not required to submit bids for each but may do so if he chooses. Bidder may submit a single bid for General Work, Mechanical Work, Electrical Work or a combination. Bidder may bid any or all schedules as he chooses. If Agreement is to be awarded, a single agreement for Schedule A or three separate Agreements for Schedule B will be awarded for the schedule resulting in the lowest total project bid. Schedule C - Is a separate schedule for the Forcemain work. All work is to be in accordance with the Bidding Documents which are on file in the office of the City Engineer, Grand Forks, North Dakota, reference to which is made for detailed description of the work. Each bid must be accompanied by a separate PDF document (uploaded to Quest VirtuBid) containing an acceptable bidder's bond in a sum equal to five percent of the full amount of the bid, executed by the bidder as principal and by a surety, conditioned that if the principal's bid be accepted and the contract awarded to the principal, the principal, within ten days after notice of award, will execute a contract in accordance with the term of the bid and a contractor's bond as required by law and the regulations and determinations of the Grand Forks City Council. Bidders on this work will be required to comply with Title 40 CFR Part 33- Participation by Disadvantaged Business Enterprises in the United States Environmental Protection Agency Programs. The requirements for bidders and contractors under this regulation concern utilization of Minority Business Enterprises (MBE), Women's Business Enterprises (WBE), and Small Business Enterprises (SBE) and are explained in the specifications. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in the specifications. Bidders on this work will be required to comply with American Iron and Steel requirements of the Consolidated Appropriations Act, 2014. The requirements for bidders and contractors under this regulation are explained in the specifications. Additional Description: The City Council reserves the right to reject any or all bids and/or to waive any informality in the bids received and to accept any bid deemed to be most favorable to the interest of the City of Grand Forks. The successful bidder shall warrant and guarantee work for two years and shall furnish performance and payment bonds, in the amount of 100% of the contract. Bonds shall remain in effect until two years after date of final payment. Within fifteen (15) days after effective date of Agreement, Contractor shall submit to Owner a written notice indicating the specific date that Contractor will begin construction. Unless extended as per Article 11 of the General Conditions, Schedule A or B, Milestone "A" (All work with the exception of grass and landscaping) shall be completed by June 30, 2024, and all work shall be completed and ready for final payment in accordance with paragraph 15.06 of the General Conditions no later than October 15, 2024; Schedule C, Milestone "A" (all work requiring forcemain shut-down) shall be completed within 3 calendar days, and all work shall be completed and ready for final payment in accordance with paragraph 15.06 of the General Conditions no later than October 31, 2023. Bid results - Option 1 SRF Compliant Schedule B - Mechanical - McFarlane Inc. - $143,900.00 Option 2 Non SRF Schedule B - Mechanical - McFarlane Inc. - $134,800.00
Bid Results
Water / Sewer
$278,700.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 9, 2023
April 10, 2023
To Be Determined, Grand Forks, ND
Related To This Project
Grand Forks, ND
Bid Date: Apr 20 2023
Grand Forks, ND
Bid Date: Mar 09 2023
Grand Forks, ND
Bid Date: Mar 16 2023
Grand Forks, ND
Bid Date: Mar 09 2023
Grand Forks, ND
Bid Date: Mar 09 2023
Grand Forks, ND
Bid Date: Mar 23 2023
Grand Forks, ND
Bid Date: Mar 09 2023
Grand Forks, ND
Bid Date: Mar 16 2023
Grand Forks, ND
Bid Date: Mar 09 2023
Grand Forks, ND
Bid Date: Mar 09 2023
Grand Forks, ND
Bid Date: Mar 09 2023
Grand Forks, ND
Bid Date: Jan 18 2024
Grand Forks, ND
Bid Date: Mar 09 2023
Grand Forks, ND
Bid Date: Mar 09 2023
Grand Forks, ND
Bid Date: Feb 13 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.