BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a mixed-use development in Rockford, Illinois. Working plans call for site work for a playground / park / athletic field; water / sewer project; for the demolition of a bridge / tunnel; bridge / tunnel; and playground / park / athletic field.

Project cancelled. The Park District invites qualified contractors to submit a bid on phase 2 of the Keith Creek bank stabilization within Alpine Hills Adventure Park. Work includes construction and repair of in-stream features within Keith Creek, as well as demolition of an existing pedestrian bridge structure, site grading, native seeding, and site restoration. A. The purpose of this project is to restore approximately 900 linear feet of the South Fork of Keith Creek that is severely eroding and down-cutting. Restoration will include installation of four cross vane grade control structures, installation of approximately 485 linear feet of stone toe bank protection, bank grading to increase flood flow capacity, and repair of a riffle structure over a 27 inch diameter sanitary sewer line. Project work is expected to begin in spring of 2023. B. Contractor shall construct in-stream structures according to details in the Project Plan Set using materials in accordance with the specified sizes shown. C. Vegetation removal will be completed by Others prior to this work. D. Contractor shall have experience installing streambank restoration structures specified, or acceptable equivalents, and be able to provide evidence of instream construction experience if requested. E. Special Conditions for this project are intended to define specific items of the project in more detail than provided in the Project Plan Set for this project. Rockford Park District intends to contract for the following items and services; specifications are on file . The Park District invites qualified contractors to submit a bid on phase 2 of the Keith Creek bank stabilization within Alpine Hills Adventure Park. Work includes construction and repair of instream features within Keith Creek, as well as demolition of an existing pedestrian bridge structure, site grading, native seeding, and site restoration. The Rockford Park District reserves the unrestricted right to reject any or all bids received, to waive or not to waive any informality, or to accept the bid considered to be in the best interest of the Park District. Contractor shall not pay less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the IL Wages of Employees on Public Works Act (820 ILCS 130/1-12).

Final Planning

Bridges / Tunnels

$500,000.00

Public - City

Demolition, Site Work

12

8

4

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
113
Bidding Soon
2,129
All Active Projects
918
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2023

June 1, 2023

img_map_placeholder

4402 Larson Ave, Rockford, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.