EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 27, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Van Buren, Arkansas. Completed plans call for site work for a water / sewer project.

This project includes the construction of drainage improvements to Pointer Trail East located in Crawford County, Arkansas (HWEI Project No. 2022004) as specified in these Specifications and shown on the Construction Plans. Question Deadline 02/27/2023 Questions received less than three (3) days prior to the date for opening of Bids may not be answered. The Information for Bidders, Form of Bid, Form of Contract, Plans, Specifications, and other contract documents may be examined at the following location: Hawkins-Weir Engineers, Inc. 110 South 7th Street Van Buren, Arkansas 72956 479.474.1227 Bidders will be required to inform themselves of all Addenda duly issued in accordance with the requirements provided in the Instructions to Bidders. Information regarding the number of Addenda that have been duly issued can be obtained from Hawkins-Weir Engineers at the address above. Each Bidder must deposit with their Bid, security in the amount, form and subject to the conditions provided in the Instructions to Bidders. All Bidders must be licensed in conformance with the Arkansas State Licensing Law for Commercial Contractors as defined in Arkansas Code 17-25-101 and related statutes. Crawford County, Arkansas, reserves the right to waive any informalities and reject any and all Bids. Bids shall remain firm for a period not to exceed 60 days from the Bid opening date. Crawford County, Arkansas hereby notifies all Bidders that, in regard to any agreement entered into pursuant to this advertisement; small, minority and women owned business enterprises will be afforded equal opportunities to submit Bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, age, religion, or national origin in consideration for an award. Bid Result SCHEDULE I_ Crawford Construction $502,805 SCHEDULE II Crawford Construction $416,619

Award

Water / Sewer

$919,424.00

Public - County

Site Work

12

13

6

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Exploratory Excavations, Site Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Finishes
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Embankments, Roadway Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
38
Bidding Soon
542
All Active Projects
209
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2023

April 3, 2023

img_map_placeholder

Multiple Locations, Van Buren, AR

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Pointer Trail East Drainage Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.