Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, renovation and addition to an educational facility in Crown Point, Indiana. Completed plans call for the addition of a 2,534-square-foot, one-story above grade educational facility; for the demolition of a educational facility; for the renovation of a 2,569-square-foot, one-story above grade educational facility; and for site work for a educational facility.
As of February 16, 2024, the project has been awarded, however, information regarding the awarded contractors and a timeline for construction have not been confirmed. Jerry Ross Elementary School Additions, Renovations, and Related Work 11319 Randolph St., Crown Point, IN 46307. Concrete; concrete equipment pads and housekeeping pads shown or required for fire protection, plumbing, mechanical and electrical equipment are the responsibility of the contractor installing or providing the equipment. The Bid Category Nos. 1, 4, 5, and 6 Contractors shall include all work (temporary or permanent) associated with maintaining the existing or providing new Storm, Water, Sanitary, Heating, Ventilation, Cooling, Fire Protection, Gas, Life Safety Systems, Fire Alarm, Sound Systems, Technology and Electrical Services throughout the duration of the project. A. Bid Category No. 1 Sitework/General Trades $30,000 B. Bid Category No. 2 Painting $5,000 C. Bid Category No. 3 Flooring $5,000 D. Bid Category No. 4 Plumbing $10,000 E. Bid Category No. 5 Mechanical $10,000 F. Bid Category No. 6 Electrical $15,000 Existing main entry flooring to remain. Existing Boilers and Pumps configuration to remain Existing domestic water heater system to remain Existing lighting to remain. All work for the complete construction of the Project will be under one or more prime contracts with the Owner based on bids received and on combinations awarded. The Construction Manager will manage the construction of the Project. Construction shall be in full accordance with the Bidding Documents which are on file with the Owner and may be examined by prospective bidders at the following locations: The Skillman Corporation 8006 Aetna Street Merrillville, IN 46410 Bid security in the amount of ten percent (10%) of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The successful Bidders will be required to furnish Performance and Payment Bonds for one hundred percent (100%) of their Contract amount prior to execution of Contracts. Contractors submitting bids for the performance of any Work as specified in this building Project should make such Bids to Crown Point Community School Corporation. Contractors are advised that the Contract as finally entered into with any successful Bidder may be entered into with either the School Corporation or the Building Corporation or certain portions of the Contract may be entered into by both the School Corporation and the Building Corporation. The Owner reserves the right to accept or reject any Bid (and to waive any irregularities in bidding. All Bids may be held for a period not to exceed 60 days before awarding contracts. Construction shall be complete within 284 consecutive calendar days Bid result : 1 Sitework/General Trades - Gariup Construction - $689,500 2 Painting - Stan's Painting - $41,678 3 Flooring - Master Tile - $53,000 4 Plumbing - Circle R Mechanical - $63,875 5 Mechanical - Mechanical Concepts - $44,000 6 Electrical - EMCOR Hyre Electric - $160,000
Award
Educational
$1,052,053.00
Public - City
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 9, 2023
March 27, 2023
11319 Randolph St, Crown Point, IN
Related To This Project
Crown Point, IN
Bid Date: Apr 05 2023
Crown Point, IN
Bid Date: Mar 22 2023
Crown Point, IN
Bid Date: Mar 22 2023
Crown Point, IN
Bid Date: Apr 13 2023
Crown Point, IN
Bid Date: Apr 12 2023
Crown Point, IN
Bid Date: May 12 2021
Crown Point, IN
Bid Date: Apr 19 2023
Crown Point, IN
Bid Date: Apr 19 2023
Crown Point, IN
Bid Date: Mar 22 2023
Crown Point, IN
Bid Date: Mar 22 2023
Crown Point, IN
Bid Date: Mar 22 2023
Crown Point, IN
Bid Date: Feb 22 2023
Crown Point, IN
Bid Date: Feb 15 2023
Crown Point, IN
Bid Date: Feb 22 2023
Crown Point, IN
Bid Date: Feb 22 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.