BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 10, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Honolulu, Hawaii. Completed plans call for site work for a water / sewer project.

23-008-03, Water Works Repair at the Oahu District Facilities Contractor shall enter a contract with the State for furnishing repairs as it is needed for a twelve-month (12) period commencing from the official date on the Notice to Proceed This type of work is considered an emergency repair. There is a threat to the public, the boaters and the employees since the water will either be shut down or flowing at a drastically reduced rate. The Contractor is required to mobilize and be on the job with men and equipment within twelve (12) hours of the call from the Construction & Maintenance Superintendent or his representative. The Contractor is expected to work on the project every day until service is restored. The Contractor is expected to complete the work on each Project Assignment within three (3) days. The Project Assignment is divided into three segments. The first part of the Project Assignment is to locate the leak. The second portion of the Project Assignment is to repair the leak. The last part of the Project Assignment is to restore the site. If the Construction & Maintenance Superintendent and/or the Chief Engineer determines that a portion of the Project Assignment should be done outside of the regular working hours the State has included overtime, weekend, and holiday rates. Normal working hours are Monday through Friday 7:45 A.M to 4:30 P.M. The Contractor shall provide a phone number to the Construction & Maintenance Superintendent for emergencies. The Contractor shall inform the Construction & Maintenance Superintendent when there is a change. A pager or answering service number is not allowed for the emergency contact. The Contractor shall excavate the site to find the leak in the water main. The Contractor shall repair the leak and verify that there are not more leaks in water main before backfilling the trench and restoring the site. The specifications for trenching, backfilling, and compacting are included in this solicitation. The specifications asphalt is also included. The Contractor shall restore the site after repairing the leak. If the leak is in an area that is covered with concrete or asphalt that existing material shall be replaced according to industry standards. If the leak is in a planting area any irrigation shall be replaced.

Award

Water / Sewer

$451,896.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
20
Bidding Soon
234
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2023

April 27, 2023

Project location map

Multiple Locations, Honolulu, HI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.