Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published April 7, 2023 at 8:00 PM
Updated January 29, 2024
Site work for a playground / park / athletic field in Mears, Michigan. Completed plans call for site work for a playground / park / athletic field.
ORV Area Exit Ramp work: Excess sand to be removed on the exit ramp to the provide safe grade and slope for ORV travel. Care and precautions to be taken to avoid damaging all signs, posts, or fencing along the sides of the down ramp. Signs may be removed by contractor if preferred but the contractor will reinstall all they remove at the same location and manner prior to removal. Excess sand will be relocated to the South Flats area in the dunes (refer to map). Relocated sand will be spread out to avoid leaving piles. Mount Baldy base work: Sand removal and relocation to take place at east end base of Mount Baldy to maintain current travel lanes for vehicles. Sand needs to be cleared approximately 10 feet back from the westernmost edge of the vehicle travel lanes. Care to be taken to avoid damage to all vegetation and paved surfaces in the area. Signs and posts in this area will be removed by park staff prior to contractor beginning work. If additional removal is needed, contractor will request as soon as possible to park management. Excess sand will be relocated to the South Flats area in the dunes (refer to map).Relocated sand will be spread out to avoid leaving piles. ORV area Entrance Ramp: Sand removal and relocation on the upper portion of the ORV entrance ramp to maintain safe grade and slope for ORV travel. Sand removal to take place between and under the guard rail sections to adequately maintain proper function of guard rail. Relocated sand may be transported to the designated areas and must be spread out to avoid leaving piles.
Post-Bid
Playgrounds / Parks / Athletic Fields
$71,375.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 6, 2023
March 13, 2023
9679 W. State Park Rd., Mears, MI
Related To This Project
Mears, MI
Bid Date: Mar 05 2024
Mears, MI
Bid Date: Oct 04 2024
Mears, MI
Bid Date: Mar 23 2026
Mears, MI
Bid Date: Jun 08 2022
Grayling, MI
Bid Date: Feb 16 2023
Redford, MI
Bid Date: Feb 27 2023
Sylvan Township, MI
Bid Date: Mar 08 2023
Lansing, MI
Bid Date: Feb 21 2023
Mason, MI
Bid Date: Mar 01 2023
Waterford, MI
Bid Date: Feb 24 2023
Holland, MI
--
West Bloomfield, MI
Bid Date: Mar 08 2023
Battle Creek, MI
Bid Date: Mar 16 2023
Niles, MI
Bid Date: Mar 08 2023
Munising, MI
Bid Date: Mar 15 2023
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed