BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Norton, West Virginia. Completed plans call for site work for a water / sewer project.

The Project includes the following Work: Sanitary Sewer Extension to 37 customers including approximately 2,200 LF of 8" gravity sewer line, 550 LF of 6" gravity sewer line, 2,000 LF of 3" forcemain, 4 package lift stations, 28 manholes and other necessary apurtenances. Bids are requested for the following Contract: Phase III - Sanitary Sewer System Extension The Work will be substantially completed within 150 calendar days after the date when the Contract Times commence to run, and completed and ready for final payment within 180 days after the date when the Contract Times commence to run. Liquidated damages shall be $1000.00 per day A two envelope system will be used. Envelope No. 1 must have the following information presented on the front: Name and address of Bidder Bid on Contract - Phase III - Sanitary Sewer System Extension Received by the Norton-Harding-Jimtown Public Service District Envelope No. 2 labeled "Bid Proposal" shall also be placed inside of Envelope #1. Envelope No. 1 will be opened first and the Bid Opening Requirement items checked for compliance as outlined on the Bid Opening Checklist on page BOR - 1 of these contract documents. If such documents are found to be in order, Envelope No. 2 "Bid Proposal", will then be opened and will be publicly read aloud. If the documents required to be contained in Envelope No. 1 are not in order, Envelope No. 2 "Bid Proposal" will not be opened and the Bid will be considered non-responsive and will be returned to the Bidder. A bidder may not withdraw his bid for a period of ninety (90) days after the date set for the opening of bids. Bids shall be accompanied by a certified check or bid bond payable to Norton-Harding-Jimtown Public Service District in an amount equal to five percent (5%) of the base bid. Nondiscrimination in Employment - Bidders on this work will be required to comply with the President's Executive Order Number 11246 and the provisions of Executive Order No. 10925 as included therein. The requirements for bidders and contractors under this order are explained in the specifications. Contractor is required to provide the Drug Free Workplace Certification in accordance with WV Code 21- 1D-5. All Bidders are required to have a West Virginia Contractor's License per Section 21-11-11 of the West Virginia Code. Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. American Iron and Steel Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials.

Award

Water / Sewer

$1,249,059.00

Public - City

Site Work

36

25

2

7

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
24
Bidding Soon
265
All Active Projects
111
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2023

May 15, 2023

img_map_placeholder

Multiple Locations, Norton, WV

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.