BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a detention facility in San Rafael, California. Completed plans call for the renovation of a detention facility.

The project includes the installation of a new Jail Video Security System, including the Jail Programmable Logic Controller, Video Management System, intercom system, public address system, and upgrades to the existing Central Control Unit. The current system is also integrated with the door control, intercom, and movement systems, which provide camera views to the control room operator as door control buttons are activated. Bids are required for the entire work described herein. The Contractor shall possess a valid Class C-10 Electrical Contractors License at time of bid submittal. A Bid Bond in the amount of 10% of the total bid amount payable to the County of Marin shall accompany the Proposal. The provisions of California Public Contract Code 22300, regarding substitution of securities for monies withheld to ensure performance shall apply to this contract. This project is to be advertised pursuant to Public Contract Code 22037. Pursuant to Section 1773 of the California Labor Code, the general prevailing wage rates for Marin County where the work is to be done have been determined by the Director of the California Department of Industrial Relations. These wages are set forth in the General Prevailing Wage Rates for this project, available at the Department of Public Works. Bidders may request reasonable accommodation for auxiliary aids by contacting Maja Loncar at mloncar@marincounty.org or by calling (415) 473-2636. The intent of the Contract is to prescribe and provide for a complete Work or improvement which the Contractor shall undertake and accomplish in full compliance with the Drawings, Specifications and other Contract Documents. The Contractor shall perform all items of work encompassed and stipulated in the Drawings and Specifications or reasonably inferable therefrom as necessary to produce the intended results. It is further intended that the Contractor shall perform all miscellaneous work required to make existing, adjacent or effected developments, improvements and construction conform to the new work.

Bid Results

Jails / Prisons

$1,695,800.00

Public - County

Renovation

38

20

2

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
78
Bidding Soon
1,751
All Active Projects
730
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2023

May 22, 2023

img_map_placeholder

13 Peter Behr Dr, San Rafael, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.